MIS02-00075
| BLD-Conference | 4/3/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | A | CANC |
|
|
sub-standard housing 4/3/2002 3:04:17 PM
|
BLD02-00235
| BLD-Conference | 4/3/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | A | PASS |
|
|
Mike ###-#### call 1st, 30 min , go over c/n 4/3/2002 3:22:44 PM
c/n posted, ok to insulate, verify interior shear at energy code 4/4/2002 9:41:50 AM
|
BLD01-02371
| BLD-Final | 4/3/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | A | PASS |
|
|
fn for gar --jim -carney- ###-####--call 1st before insp
|
BLD02-00586
| BLD-Footing | 4/3/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | A | PART |
|
|
###-#### john
|
BLD02-00492
| BLD-Framing/Rough-in | 4/3/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 13:44:06. Contact: ###-####.///need 2 straps, ok to insulate 4/5/2002 9:16:33 AM
|
BLD01-02338
| BLD-Framing/Rough-in | 4/4/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 07:50:44. Contact: ###-####.////ext shear ok on building #1 4/5/2002 9:15:10 AM
|
BLD00-03414
| BLD-Framing/Rough-in | 4/4/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | P | PART |
|
|
sheer wall ###-#### shawn
int shear 4/5/2002 9:15:37 AM
|
BLD02-00302
| BLD-Footing | 4/4/2002 | 4/4/2002 | 4/4/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 08:44:54. Contact: ###-####.
|