BLD02-00542
| BLD-Framing/Rough-in | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 4:08:09 PM. ...complete air seal ok to insulate 4/4/2003 1:47:46 PM
|
BLD03-00201
| BLD-Conference | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | FAIL |
|
|
c/n issued: add SF dampers at lobby 4/4/2003 10:35:55 AM
|
MEC03-00835
| Conference | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | FAIL |
|
|
c/n issued re dampers...seal all exit penetrations 4/4/2003 10:36:24 AM
|
BLD02-00369
| BLD-Conference | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | PASS |
|
|
meet w/ ISI re 4hr walls... 4/4/2003 1:48:20 PM
|
BLD95-00237
| BLD-Final | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | NR |
|
|
###-####, fred
|
BLD02-00369
| BLD-Conference | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | FAIL |
|
|
randy, c/n : need eng'g for steel studs, clarify shear walls...etc. 4/9/2003 7:21:16 PM
|
BLD02-01771
| BLD-Final | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | NR |
|
|
DOUG; Phone #: ###-#### Internet Inspection Request from: Darla Downs, nr, need htg, called no answer 4/4/2003 4:57:41 PM
|
BLD02-00369
| BLD-Conference | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | PASS |
|
|
1:30
|
BLD02-00542
| BLD-Framing/Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | PART |
|
|
ok to cover at rear stair...show 2 layer drywall install at lid; complete fire blocks throughout, WIP 4/4/2003 4:51:30 PM
|
BLD95-00237
| BLD-Final | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | NR |
|
|
|
BLD03-00603
| BLD-Framing/Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | FAIL |
|
|
###-####, seal penetrations, need elec r/i 4/4/2003 5:15:08 PM
|
BLD03-00068
| BLD-Final | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | NR |
|
|
###-####
|