Inspections for the day of: Friday, April 4, 2003.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC02-03357 Final4/3/20034/4/20034/4/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Veronica England
MEC02-03357 Pressure Test4/3/20034/4/20034/4/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Veronica England
BLD01-01345 BLD-Final4/4/20034/4/20034/4/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/4/2003 at 7:22:27 AM. Contact: ###-####.ok for perm occ 4/4/2003 1:11:19 PM
BLD03-00536 BLD-Foundation4/3/20034/4/20034/4/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 4/3/2003 at 2:15:35 PM. Contact: ###-####.
BLD03-00006 BLD-Framing/Rough-in4/3/20034/4/20034/4/2003 12:00:00 AMPPASS
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover int and ext 4/4/2003 12:59:42 PM
BLD03-00536 BLD-Foundation4/4/20034/4/20034/4/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/4/2003 at 7:52:27 AM. Contact: ###-####.
BLD02-01800 BLD-Framing/Rough-in4/4/20034/4/20034/4/2003 12:00:00 AMPPART
###-#### ok to insulate 4/4/2003 1:38:19 PM
BLD03-00338 BLD-Framing/Rough-in4/4/20034/4/20034/4/2003 12:00:00 AMPFAIL
###-####shear needs to block second level and finsh front and bact pourch 4/7/2003 8:52:30 AM
MEC02-02532 Final4/4/20034/4/20034/4/2003 12:00:00 AMPPASS
david this passed the gas test ,amy doc finaled it now it just needs to be finaled ..thanks darla