MEC02-03357
| Final | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
MEC02-03357
| Pressure Test | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
BLD01-01345
| BLD-Final | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/4/2003 at 7:22:27 AM. Contact: ###-####.ok for perm occ 4/4/2003 1:11:19 PM
|
BLD03-00536
| BLD-Foundation | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 4/3/2003 at 2:15:35 PM. Contact: ###-####.
|
BLD03-00006
| BLD-Framing/Rough-in | 4/3/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | PASS |
|
|
JACK; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to cover int and ext 4/4/2003 12:59:42 PM
|
BLD03-00536
| BLD-Foundation | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/4/2003 at 7:52:27 AM. Contact: ###-####.
|
BLD02-01800
| BLD-Framing/Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | PART |
|
|
###-#### ok to insulate 4/4/2003 1:38:19 PM
|
BLD03-00338
| BLD-Framing/Rough-in | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | FAIL |
|
|
###-####shear needs to block second level and finsh front and bact pourch 4/7/2003 8:52:30 AM
|
MEC02-02532
| Final | 4/4/2003 | 4/4/2003 | 4/4/2003 12:00:00 AM | P | PASS |
|
|
david this passed the gas test ,amy doc finaled it now it just needs to be finaled ..thanks darla
|