Inspections for the day of: Tuesday, April 4, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00594 INSP-Sprinkler Rough-in4/4/20064/4/20064/4/2006 4:54:46 PMPPART
Performed standpipe flow test as required.
FIR05-00712 INSP-Final Inspection4/3/20064/4/20064/4/2006 3:09:06 PMPFAIL
Third floor phase 2 only tested at this time, provide lock and label at fire alarm breaker, visual notification at the SE corridor junction is not in sync, relocate a/v to provide proper coverage at the corridor area adjacent to the SE stairs, provide central station signal verification list for signals recieved during today's test at next inspection. Guest rooms, nac panel, EOL, and corridor detection tested okay.
FIR05-00804 INSP-Final Inspection3/30/20064/4/20064/4/2006 11:46:11 AMACANC
Inspection for Tel Hood Fire supresion cabinet; Phone #: ###-#### Internet Inspection Request from: Harry Thompson Canceled per phone conversation with H. Thompson due to scheduling conflicts.
FIR05-00898 INSP-Final Inspection4/3/20064/4/20064/4/2006 11:24:17 AMAPASS
Fire alarm issues have been corrected as required, permit finaled.
BLD05-03349 FIRE-Final Inspection4/3/20064/4/20064/4/2006 10:51:15 AMAPASS
Required corrections have been completed, life safety finaled.
FIR06-00073 INSP-Sprinkler Rough-in/Hydro3/31/20064/4/20064/4/2006 7:17:00 AMACANC
Scheduled by a contractor via Hello! on 3/31/2006 at 1:34:47 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 4 2006 7:17AM.