FIR05-00594
| INSP-Sprinkler Rough-in | 4/4/2006 | 4/4/2006 | 4/4/2006 4:54:46 PM | P | PART |
|
|
Performed standpipe flow test as required.
|
FIR05-00712
| INSP-Final Inspection | 4/3/2006 | 4/4/2006 | 4/4/2006 3:09:06 PM | P | FAIL |
|
|
Third floor phase 2 only tested at this time, provide lock and label at fire alarm breaker, visual notification at the SE corridor junction is not in sync, relocate a/v to provide proper coverage at the corridor area adjacent to the SE stairs, provide central station signal verification list for signals recieved during today's test at next inspection. Guest rooms, nac panel, EOL, and corridor detection tested okay.
|
FIR05-00804
| INSP-Final Inspection | 3/30/2006 | 4/4/2006 | 4/4/2006 11:46:11 AM | A | CANC |
|
|
Inspection for Tel Hood Fire supresion cabinet; Phone #: ###-#### Internet Inspection Request from: Harry Thompson Canceled per phone conversation with H. Thompson due to scheduling conflicts.
|
FIR05-00898
| INSP-Final Inspection | 4/3/2006 | 4/4/2006 | 4/4/2006 11:24:17 AM | A | PASS |
|
|
Fire alarm issues have been corrected as required, permit finaled.
|
BLD05-03349
| FIRE-Final Inspection | 4/3/2006 | 4/4/2006 | 4/4/2006 10:51:15 AM | A | PASS |
|
|
Required corrections have been completed, life safety finaled.
|
FIR06-00073
| INSP-Sprinkler Rough-in/Hydro | 3/31/2006 | 4/4/2006 | 4/4/2006 7:17:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 3/31/2006 at 1:34:47 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Apr 4 2006 7:17AM.
|