ESC09-00198
| General Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 3:03:15 PM | | PASS |
|
|
No change in status. Informed RP that either transfer the permit to Cloverdale or grade out and re-vegetation should occur no later than summer of 2011.
|
ESC09-00352
| Conference | 4/1/2011 | 4/4/2011 | 4/4/2011 2:36:44 PM | P | PASS |
|
|
Gary and Ron, review contingency plan for high water flows during runnoff, met at the Lift Station on ParkCenter. Met with Gary, Ron and Brent from the Wetlands, also Kelly from Parks and Clint from PDS. Controls are in place, curtains, bare ground have tackifier and beams and cells in place to reduce turbid discharges in preparation of upcoming increased flows.
|
ESC07-00386
| General Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 1:20:56 PM | | PASS |
|
|
No change but not ready to final.
|