BLD12-00107
| FIRE-Conference | 4/4/2012 | 4/4/2012 | 4/5/2012 1:32:12 PM | P | DONE |
|
|
On site conference with tenant regarding fire life safety conditions prior to occupancy.
|
FIR12-00114
| INSP-Final Inspection | 4/4/2012 | 4/4/2012 | 4/4/2012 3:12:52 PM | P | DEFR |
|
|
|
FIR11-00448
| INSP-Sprinkler Rough-in | 4/4/2012 | 4/4/2012 | 4/4/2012 3:08:24 PM | P | PART |
|
|
Previous correction items including retainers and seismic bracing at mech. room 44, and overspaced coverage at N. mech. access finished. Plan modification pending.
|
FIR10-00628
| FIR-Aging Inspection | 4/4/2012 | 4/4/2012 | 4/4/2012 2:19:35 PM | A | DONE |
|
|
Conversation with contractor regarding project status.
|
FIR11-00496
| INSP-Sprinkler Rough-in | 4/3/2012 | 4/4/2012 | 4/4/2012 1:49:24 PM | A | PART |
|
|
Inspection for cover at the 2nd floor core common area soffits, five 3rd floor showers, and the 1st floor north wing under stair rough-in approved.
|
FIR11-00329
| INSP-Final Inspection | 4/4/2012 | 4/4/2012 | 4/4/2012 1:44:54 PM | A | PART |
|
|
Completed testing for new smoke detectors, notification appliances, and overhead door closures.
|
FIR11-00353
| INSP-Final Inspection | 4/4/2012 | 4/4/2012 | 4/4/2012 1:38:00 PM | A | NR |
|
|
|
BLD12-00139
| FIRE-Conference | 4/4/2012 | 4/4/2012 | 4/4/2012 1:35:31 PM | A | DONE |
|
|
Regarding IFC 2009 sec. 1008.1.9.3
|
FIR11-00651
| INSP-Sprinkler Rough-in/Hydro | 4/3/2012 | 4/4/2012 | 4/4/2012 1:31:48 PM | A | PART |
|
|
Overhead hydrostatic test of the new dry system passed. Inspection for seismic brace attatchments at the wet system mains completed.
|
FIR12-00096
| INSP-Final Inspection | 4/3/2012 | 4/4/2012 | 4/4/2012 1:27:15 PM | A | FAIL |
|
|
Need to relocate the manual pull to an accessible location.
|