PLM12-03108
| PLM-Aging Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 4:55:11 PM | | PASS |
|
|
no request for inspection
|
PLM12-02419
| PLM-Aging Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 4:52:39 PM | | PASS |
|
|
|
PLM13-00315
| Final | 4/4/2013 | 4/4/2013 | 4/4/2013 3:43:50 PM | P | PASS |
|
|
Norco will be there at 12:00 to test. If you can be there at 2:00 pm that would be great. Thank you! Phone #: ###-#### >> Inspection requested via web by Anderson Kenny
|
PLM13-00777
| Final | 4/4/2013 | 4/4/2013 | 4/4/2013 3:26:44 PM | P | PASS |
|
|
>> Inspection requested via web by michelle favinger
|
PLM12-01436
| Final | 4/4/2013 | 4/4/2013 | 4/4/2013 2:38:48 PM | P | PART |
|
|
We''ve installed break room sink and put back flows on the eye washes, That is only items that needed to be done after last weeks partial final need to install pvb by mop sink as per table 6-2 I S P C 12 inches above down stream piping and flood level rim of receptor called contractor will recall when ready Thanks Phone #: ###-#### >> Inspection requested via web by MICHAEL BYERS
|
PLM12-03070
| Final | 4/3/2013 | 4/4/2013 | 4/4/2013 2:34:05 PM | P | PASS |
|
|
>> Inspection requested via web by David Salamon
|
PLM12-02344
| PLM-Aging Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 11:21:05 AM | | PASS |
|
|
under construction
|
MEC13-01298
| Final | 4/3/2013 | 4/4/2013 | 4/4/2013 11:18:54 AM | A | PASS |
|
|
Please call James prior to going to ensure he will meet you there .. ###-####.. Thank you Phone #: ###-#### >> Inspection requested via web by Rhonda Marcum
|
MEC13-01146
| Final | 3/28/2013 | 4/4/2013 | 4/4/2013 10:46:19 AM | A | FAIL |
|
|
Please call Ray before you go ###-#### Phone #: ###-#### >> Inspection requested via web by Echo Jackson need to remove single wall vent ing in crawl space and replace with double wall B vent called contractor will recall when ready
|
PLM13-00773
| Water Heater Final | 4/3/2013 | 4/4/2013 | 4/4/2013 9:35:12 AM | A | PASS |
|
|
Call Sonya prior ###-#### Phone #: ###-#### >> Inspection requested via web by curtis rowe
|
PLM13-00698
| Plumbing Rough-in | 4/3/2013 | 4/4/2013 | 4/4/2013 9:28:15 AM | A | PASS |
|
|
Habitat for Humanity house Paul Thompson ###-#### Phone #: ###-#### >> Inspection requested via web by Chris Field
|
PLM13-00513
| Water Heater Final | 4/4/2013 | 4/4/2013 | 4/4/2013 9:07:09 AM | A | PASS |
|
|
|