Inspections for the day of: Thursday, April 4, 2013.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00639 FIR-Aging Inspection4/4/20134/4/20134/5/2013 4:57:19 PM DONE
Site construction in process
FIR12-00586 FIR-Aging Inspection4/4/20134/4/20134/4/2013 5:23:36 PM DONE
Site work in progress
BLD13-00081 FIRE-Sprinkler Rough-in4/4/20134/4/20134/4/2013 5:12:42 PMAPART
BLD13-00632 FIRE-Final Inspection4/4/20134/4/20134/4/2013 5:01:42 PMPPASS
Life safety approved pending hardware revisions at the main entry/exit to be completed prior to structural final as agreed.
BLD13-00620 FIRE-Final Inspection4/3/20134/4/20134/4/2013 4:59:57 PMPFAIL
Correction items include; repair EM lights at several locations, post additional fire extinguishers per ft2 and travel distance requirements, provide approved hardware at the main entry/exit of suite C, reverse lockset at suite C interior office door.
BLD12-02771 FIRE-Final Inspection4/4/20134/4/20134/4/2013 2:33:40 PMPNR
Final pending corrections
FIR12-00647 INSP-Final Inspection4/4/20134/4/20134/4/2013 2:28:49 PMAPASS
Fire alarm permit approved for final status.
FIR13-00091 INSP-Final Inspection4/4/20134/4/20134/4/2013 2:27:26 PMAPASS
Fire sprinkler work passed final walkthrough, permit finaled.
FIR13-00111 INSP-Conference4/4/20134/4/20134/4/2013 2:25:49 PMADONE
Regarding site inspection schedule and after hours testing.
FIR12-00252 INSP-Conference4/4/20134/4/20134/4/2013 2:24:39 PMADONE
Contact Michael #: ###-#### Regarding existing system conditions