FIR18-00186
| INSP-Final Inspection | 4/3/2018 | 4/4/2018 | 4/4/2018 1:46:00 PM | P | PASS |
|
|
Permit finaled
Brian Hodge Phone #: ###-####
|
FIR18-00071
| INSP-Final Inspection | 4/3/2018 | 4/4/2018 | 4/4/2018 1:45:35 PM | A | FAIL |
|
|
Provide grounding as per the installation manual, provide supervisory monitoring as per review comments, Provide dedicated circuit (connecting to the FACP is ok)
radio install Laura Phone #: ###-####
|
BLD17-03412
| FIRE-Final Inspection | 4/2/2018 | 4/4/2018 | 4/4/2018 11:44:55 AM | A | PASS |
|
|
Life safety passed. The fire extinguisher was being hung and the blank for the deadbolt on the rear exit door was being installed. I let the owner know that ADA hardware was to be installed on the Storage and Restroom doors prior to a building sign off.
Jay-please call with a meet time Phone #: ###-####
|
FIR18-00029
| INSP-Sprinkler Rough-in | 4/3/2018 | 4/4/2018 | 4/4/2018 9:14:28 AM | A | PASS |
|
|
Remaining piping is ok for cover.
|