BLD16-04498
| BLD-Aging Inspection | 4/4/2018 | 4/4/2018 | 4/5/2018 2:45:13 PM | | PASS |
|
|
|
BLD16-04499
| BLD-Aging Inspection | 4/4/2018 | 4/4/2018 | 4/5/2018 2:44:57 PM | | PASS |
|
|
|
BLD17-04324
| BLD-Energy code compliance | 4/3/2018 | 4/4/2018 | 4/4/2018 4:06:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD17-04324
| BLD-Framing/Rough-in | 4/3/2018 | 4/4/2018 | 4/4/2018 4:06:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. All issues have been resolved.
|
BLD17-03125
| BLD-Framing/Rough-in | 4/4/2018 | 4/4/2018 | 4/4/2018 3:18:53 PM | P | FAIL |
|
|
Vince Phone #: ###-####. Comlplete lateral bracing on B04, C01, C02 and C03 trusses. Ok to insulate. Correction notice posted.
|
BLD17-04638
| BLD-Framing/Rough-in | 4/4/2018 | 4/4/2018 | 4/4/2018 2:53:12 PM | P | FAIL |
|
|
Vince Phone #: ###-####. Install the bearing block on the A01 truss. Nail off hangar on A12 truss. Fireblock at ceiling level by tub. Install the missing lateral brace on B4 truss. nail off webs on B4 truss per the engineering. Correction notice posted. Ok to insulate.
|
BLD17-04636
| BLD-Framing/Rough-in | 4/4/2018 | 4/4/2018 | 4/4/2018 2:25:53 PM | P | FAIL |
|
|
Vince Phone #: ###-####. Provide 2 studs under 2 ply E5 truss. ok to insulate. Correctio notice posted.
|
BLD17-03412
| BLD-Final | 4/2/2018 | 4/4/2018 | 4/4/2018 1:45:04 PM | P | PASS |
|
|
Jay-would like as early PM as possible and please call with a meet time Phone #: ###-####. OK for perm occ.
|
BLD16-04512
| BLD-Energy code compliance | 4/4/2018 | 4/4/2018 | 4/4/2018 1:19:44 PM | P | PASS |
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04513
| BLD-Energy code compliance | 4/4/2018 | 4/4/2018 | 4/4/2018 1:19:34 PM | P | PASS |
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD16-04514
| BLD-Energy code compliance | 4/4/2018 | 4/4/2018 | 4/4/2018 1:19:23 PM | P | PASS |
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
|
BLD18-01130
| BLD-Final | 4/3/2018 | 4/4/2018 | 4/4/2018 12:19:57 PM | A | DONE |
|
|
Inspection requested via web by Richard Murray
|
BLD18-01130
| DOC - Permit Finaled | 4/4/2018 | 4/4/2018 | 4/4/2018 12:19:49 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD16-01757
| BLD-Conference | 4/4/2018 | 4/4/2018 | 4/4/2018 10:41:34 AM | A | DONE |
|
|
Request for Michael Jordan to visit the job site to discuss outstanding items. Phone #: ###-#### Inspection requested via web by Steve Jacobsen. Discussed 3M duct wrap EJ with contractor on wrapping the solar light tubes and duct for med gas room ventilation. Noted to contractor to send EJ to building official for approval.
|
BLD18-00392
| BLD-Foundation | 4/3/2018 | 4/4/2018 | 4/4/2018 9:42:20 AM | A | PART |
|
|
Chris Phone #: ###-####. Work in progress. Noted that verts not at 4ft. oc or horizontals rebar does not have the min 18 inch lap length as noted on the city approved plans. Will have special inspection. noted to contractor that no concrete is to be placed until special inspector has verified all non compliance issues have been resolved.
|
BLD18-00689
| BLD-Footing | 4/3/2018 | 4/4/2018 | 4/4/2018 9:12:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Troy Haney
|
BLD17-00550
| BLD-Framing/Rough-in | 4/3/2018 | 4/4/2018 | 4/4/2018 8:43:35 AM | A | PASS |
|
|
Plans at fireplace. Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD18-00689
| BLD-Other | 4/3/2018 | 4/4/2018 | 4/4/2018 8:32:17 AM | A | CANC |
|
|
This request is for a Rebar Inspection Thank you - Troy Haney HDT Pools LLC Phone #: ###-#### >> Inspection requested via web by Troy Haney Inspection cancelled from web by: Troy Haney
|
BLD16-04490
| BLD-Other | 4/3/2018 | 4/4/2018 | 4/4/2018 8:11:53 AM | A | PASS |
|
|
Fire rated assembly at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown. INspected yesterday by #480 and passed.
|