Inspections for the day of: Wednesday, April 4, 2018.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-04498 BLD-Aging Inspection4/4/20184/4/20184/5/2018 2:45:13 PM PASS
BLD16-04499 BLD-Aging Inspection4/4/20184/4/20184/5/2018 2:44:57 PM PASS
BLD17-04324 BLD-Energy code compliance4/3/20184/4/20184/4/2018 4:06:22 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD17-04324 BLD-Framing/Rough-in4/3/20184/4/20184/4/2018 4:06:10 PMPPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle. All issues have been resolved.
BLD17-03125 BLD-Framing/Rough-in4/4/20184/4/20184/4/2018 3:18:53 PMPFAIL
Vince Phone #: ###-####. Comlplete lateral bracing on B04, C01, C02 and C03 trusses. Ok to insulate. Correction notice posted.
BLD17-04638 BLD-Framing/Rough-in4/4/20184/4/20184/4/2018 2:53:12 PMPFAIL
Vince Phone #: ###-####. Install the bearing block on the A01 truss. Nail off hangar on A12 truss. Fireblock at ceiling level by tub. Install the missing lateral brace on B4 truss. nail off webs on B4 truss per the engineering. Correction notice posted. Ok to insulate.
BLD17-04636 BLD-Framing/Rough-in4/4/20184/4/20184/4/2018 2:25:53 PMPFAIL
Vince Phone #: ###-####. Provide 2 studs under 2 ply E5 truss. ok to insulate. Correctio notice posted.
BLD17-03412 BLD-Final4/2/20184/4/20184/4/2018 1:45:04 PMPPASS
Jay-would like as early PM as possible and please call with a meet time Phone #: ###-####. OK for perm occ.
BLD16-04512 BLD-Energy code compliance4/4/20184/4/20184/4/2018 1:19:44 PMPPASS
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04513 BLD-Energy code compliance4/4/20184/4/20184/4/2018 1:19:34 PMPPASS
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD16-04514 BLD-Energy code compliance4/4/20184/4/20184/4/2018 1:19:23 PMPPASS
Foundation Insulation Phone #: ###-#### Inspection requested via web by Sam Brown
BLD18-01130 BLD-Final4/3/20184/4/20184/4/2018 12:19:57 PMADONE
Inspection requested via web by Richard Murray
BLD18-01130 DOC - Permit Finaled4/4/20184/4/20184/4/2018 12:19:49 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD16-01757 BLD-Conference4/4/20184/4/20184/4/2018 10:41:34 AMADONE
Request for Michael Jordan to visit the job site to discuss outstanding items. Phone #: ###-#### Inspection requested via web by Steve Jacobsen. Discussed 3M duct wrap EJ with contractor on wrapping the solar light tubes and duct for med gas room ventilation. Noted to contractor to send EJ to building official for approval.
BLD18-00392 BLD-Foundation4/3/20184/4/20184/4/2018 9:42:20 AMAPART
Chris Phone #: ###-####. Work in progress. Noted that verts not at 4ft. oc or horizontals rebar does not have the min 18 inch lap length as noted on the city approved plans. Will have special inspection. noted to contractor that no concrete is to be placed until special inspector has verified all non compliance issues have been resolved.
BLD18-00689 BLD-Footing4/3/20184/4/20184/4/2018 9:12:37 AMAPASS
Phone #: ###-#### Inspection requested via web by Troy Haney
BLD17-00550 BLD-Framing/Rough-in4/3/20184/4/20184/4/2018 8:43:35 AMAPASS
Plans at fireplace. Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD18-00689 BLD-Other4/3/20184/4/20184/4/2018 8:32:17 AMACANC
This request is for a Rebar Inspection
Thank you - Troy Haney HDT Pools LLC Phone #: ###-#### >> Inspection requested via web by Troy Haney Inspection cancelled from web by: Troy Haney
BLD16-04490 BLD-Other4/3/20184/4/20184/4/2018 8:11:53 AMAPASS
Fire rated assembly at roof eave. Phone #: ###-#### Inspection requested via web by Sam Brown. INspected yesterday by #480 and passed.