MEC01-00910
| Rough-in | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 13:42:07. Contact: ###-####.
|
MEC01-00910
| Pressure Test | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 13:42:33. Contact: ###-####.
|
BLD00-03629
| BLD-Framing/Rough-in | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:59:31. Contact: ###-####.
c/n posted, no inspection made, need to get remodel permit , (added about 300 plus sqaure ft.) also look for point load issues, 1 hr. seperation/ ducting, property line issues/ openings, other issues 4/5/2001 11:50:36 AM
|
BLD01-00321
| BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | A | PASS |
|
|
CALL 1ST BEFORE INSP DREW ###-#### FN
c of c # 20330 issued 4/5/2001 10:50:46 AM
|
BLD00-03534
| BLD-Footing | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | A | PASS |
|
|
ft insp mike-- ###-#### --call 1st before insp
|
BLD00-01642
| BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | A | NR |
|
|
###-####
|
BLD00-02867
| BLD-Framing/Rough-in | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | FAIL |
|
|
SHEAR\\###-####
met w/ Colby the engineer, and Glen w/ Franklin homes on shear. Waiting on fixes from eng. 4/5/2001 2:13:09 PM
|
BLD00-01481
| BLD-Framing/Rough-in | 4/5/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 07:32:24. Contact: ###-####.
|
BLD01-00235
| BLD-Framing/Rough-in | 4/5/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | PART |
|
|
###-####
ext. shear ok w/ corrections 4/5/2001 4:19:18 PM
|
BLD01-00187
| BLD-Concrete | 4/5/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | PART |
|
|
walter-- ###-#### concrete
wall rebar inspection while panels are off, looks good so far, pending s. i. report 4/5/2001 3:12:04 PM
|
BLD00-03319
| BLD-Foundation | 4/5/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | PART |
|
|
###-####
ok w/ verbal corrections 4/5/2001 2:25:54 PM
|
BLD00-02330
| BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | PASS |
|
|
AFTER 1:00\\###-####
c of c # 20247 issued 4/5/2001 4:04:49 PM
|
BLD00-02351
| BLD-Framing/Rough-in | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:25:43. Contact: ###-####.
no electric at this time 4/5/2001 1:26:01 PM
|
BLD00-02351
| BLD-Wall cover | 4/4/2001 | 4/5/2001 | 4/5/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 14:27:27. Contact: ###-####. ext. shear ok w/ verbal corrections 4/5/2001 1:26:32 PM
|