MEC01-03611
| Final | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 16:23:10. Contact: ###-####.
|
MEC02-00912
| Final | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | PASS |
|
|
###-#### entry code 4321 Gas line test...added dryer....OK. 4/5/2002 10:55:25 AM
|
BLD02-00398
| BLD-Framing/Rough-in | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | PART |
|
|
###-#### Shear OK. 4/5/2002 11:51:10 AM
|
BLD02-00524
| BLD-Foundation | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 05:56:02. Contact: ###-####.
|
BLD02-00580
| BLD-Foundation | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 05:57:53. Contact: ###-####.
|
BLD02-00335
| BLD-Wall cover | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 07:25:42. Contact: ###-####. Shear OK. 4/5/2002 12:09:20 PM
|
BLD01-02677
| BLD-Energy code compliance | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 09:07:34. Contact: ###-####. Frame OK. 4/5/2002 1:40:33 PM
|
MEC02-00437
| Final | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 10:21:10. Contact: ###-####.
|
BLD02-00605
| BLD-Footing | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
###-#### george For (4) Patio posts. Advised owner of Power lines above new cover. 4/5/2002 3:39:21 PM
|
BLD02-00516
| BLD-Footing | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 19:16:21. Contact: ###-####. C/N.....Poured W/O insp. Call for wall insp. Do not pour until insp approval Need approved plans. 4/5/2002 3:24:49 PM
|
BLD02-00448
| BLD-Framing/Rough-in | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | FAIL |
|
|
###-#### C/N posted. 4/5/2002 12:38:55 PM
|