ELE02-00910
| Electrical Rough-In | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/04/2002 at 16:48:34. Contact: ###-####. went to address nothing done called 403 he wanted it transferred to him 4/5/2002 9:37:55 AM 4/5/2002 11:32:50 AM
added doorway in divider-wall new switches r/i. 4/5/2002 11:57:32 AM
|
ELE01-04013
| Final | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 06:52:20. Contact: ###-####. nec: 210-52(c)(2) shall have at least one recepticle outlet on island counter.
pantry light fixture inoperative. 4/5/2002 10:14:21 AM
|
ELE01-02776
| Final | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | A | PASS |
|
|
fn insp- rick ###-####
|
ELE02-00964
| Electrical Rough-In | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
###-#### chad r/i . kitchen, bathrm., laundry remodel r/i. 4/5/2002 1:51:48 PM
|
ELE02-00966
| Rough-In Permanent Service | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
###-#### rock. perm/svc
p/s oh re centers ele #0966-ok 4/5/2002 10:37:18 AM
|
ELE02-00968
| Permanent Service | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
john ###-#### perm/ serv. space #10. rv park
p/s oh re edwards ele #0968-ok 4/5/2002 11:14:45 AM
|
ELE02-00960
| Electrical Rough-In | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
r/i ###-####- tim . front entry walls r/i 4/5/2002 2:52:10 PM
|
ELE01-02635
| Final | 4/4/2002 | 4/5/2002 | 4/4/2002 12:00:00 AM | A | CANC |
|
|
rick- ###-#### fn--cancel already fn
|