BLD01-01109
| FIRE-Final Inspection | 4/4/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PART |
|
|
Classroom area is ok to occupy. Penatrations through corridor wall repair work needs to be verified with manufactures installation sheets 4/5/2002 4:14:50 PM
|
BLD02-00161
| FIRE-Final Inspection | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | PASS |
|
|
life/safety finaled. 4/5/2002 3:13:48 PM
|
BLD02-00161
| FIRE-Alarm Testing | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | FAIL |
|
|
two duct detectors in the new area of the store do not work and need testing, signals need to be reverified to the monitoring station (alarm,trouble and supervisiory) 4/5/2002 3:12:09 PM
|
BLD01-00496
| FIRE-Final Inspection | 4/5/2002 | 4/5/2002 | 4/5/2002 12:00:00 AM | P | FAIL |
|
|
add sprinkler head in south east corner of space, provide current inspection tag for fire sprinkler system 4/5/2002 12:44:28 PM
|