FIR04-00666
| INSP-Sprinkler Rough-in/Hydro | 4/5/2005 | 4/5/2005 | 4/6/2005 6:46:19 AM | P | PART |
|
|
24 hour pressure test on dry sytem started at 11:00 with 43.5 psi
|
FIR05-00030
| INSP-Sprinkler Rough-in/Hydro | 4/4/2005 | 4/5/2005 | 4/5/2005 2:54:46 PM | P | PASS |
|
|
Sprinkler rough-in pass. AG hydro test pass.
|
FIR05-00126
| INSP-Final Inspection | 4/5/2005 | 4/5/2005 | 4/5/2005 1:43:18 PM | P | PART |
|
|
###-#### - john Sprinkler rough in ok to cover.
|
BLD04-02410
| FIRE-Final Inspection | 4/5/2005 | 4/5/2005 | 4/5/2005 1:42:00 PM | P | PASS |
|
|
Fire life safety finaled.
|
MIS05-00038
| FIR-Final | 4/4/2005 | 4/5/2005 | 4/5/2005 11:50:15 AM | A | PART |
|
|
A temp was given until the thumbturns in the common exit corridor have been removed.
|
FIR05-00030
| INSP-Final Inspection | 4/5/2005 | 4/5/2005 | 4/5/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled.
|