Inspections for the day of: Wednesday, April 5, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00086 INSP-Sprinkler Rough-in4/4/20064/5/20064/5/2006 5:11:46 PMAPART
UG fire supply line is acceptable for cover.
FIR05-00659 INSP-Final Inspection4/4/20064/5/20064/5/2006 5:10:18 PMACANC
No time to complete inspection.
BLD06-00578 FIRE-Final Inspection4/5/20064/5/20064/5/2006 3:40:18 PMPPASS
Fire life safety is satisfactory, inspection passed.
FIR05-00712 INSP-Final Inspection4/4/20064/5/20064/5/2006 3:15:09 PMPPART
Testing of 2nd floor detection and notification devices including the guest rooms and common corridors in phase 2 completed today, need to provide plans reflecting actual installation including deleted NAC panel on the 2nd floor, elevator is not tested at this time, provide list of signal verification for today at next inspection.
FIR06-00141 INSP-Final Inspection4/4/20064/5/20064/5/2006 3:10:08 PMPFAIL
Pendent heads have been oversprayed with texture, the DSW head at the patio is covered in stucco and is missing an escutcheon.
FIR06-00147 INSP-Final Inspection4/4/20064/5/20064/5/2006 3:06:56 PMPPASS
Fire sprinkler work is satisfactory, permit finaled.
BLD05-02943 FIRE-Final Inspection4/4/20064/5/20064/5/2006 12:47:24 PMAPASS
The required corrections have been made, life safety finaled.
BLD05-02359 FIRE-Final Inspection4/4/20064/5/20064/5/2006 12:11:00 PMAPASS
Life safety is acceptable, the related alarm and sprinkler permits are finaled, no signature card available at time of inspection.
BLD05-02432 FIRE-Final Inspection4/4/20064/5/20064/5/2006 11:55:43 AMAPASS
Related alarm and sprinkler permits are approved, life safety finaled.
BLD05-02222 FIRE-Final Inspection4/4/20064/5/20064/5/2006 11:54:22 AMAPASS
Life safety finaled, related sprinkler and alarm permits are finaled.
BLD04-01324 FIRE-Final Inspection4/4/20064/5/20064/5/2006 11:53:14 AMAPASS
Project related alarm and sprinkler have been completed, life safety finaled.
FIR05-00344 INSP-Final Inspection4/5/20064/5/20064/5/2006 11:50:15 AMPPASS
Permit finaled.
BLD03-01575 FIRE-Final Inspection4/4/20064/5/20064/5/2006 11:13:52 AMACANC
to be rescheduled
BLD05-02244 FIRE-Final Inspection4/5/20064/5/20064/5/2006 11:13:31 AMPPASS
life safety finaled