FIR07-00694
| INSP-Final Inspection | 3/30/2010 | 3/30/2010 | | P | |
|
|
Robert Phone #: ###-####
|
FIR09-00642
| INSP-Sprinkler Rough-in/Hydro | 4/5/2010 | 4/5/2010 | 4/5/2010 4:04:30 PM | P | PART |
|
|
|
BLD10-00619
| FIRE-Final Inspection | 4/2/2010 | 4/5/2010 | 4/5/2010 4:04:08 PM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR09-00684
| INSP-Final Inspection | 4/2/2010 | 4/5/2010 | 4/5/2010 4:03:17 PM | A | PASS |
|
|
Fire sprinkler work passed final inspection, remainder of c/n items finished while on site.
|
BLD09-02031
| FIRE-Final Inspection | 4/2/2010 | 4/5/2010 | 4/5/2010 4:02:01 PM | A | FAIL |
|
|
Missing the required PFE per plan notes, post address numbers as discussed.
|
BLD10-00296
| FIRE-Final Inspection | 4/1/2010 | 4/5/2010 | 4/5/2010 4:00:01 PM | A | PASS |
|
|
Fire life safety finaled.
|
BLD09-02003
| FIRE-Conference | 4/2/2010 | 4/5/2010 | 4/5/2010 3:58:01 PM | A | DONE |
|
|
On site meeting regarding new exit access a the 2nd floor north stairway including new doors, relocated exit signs, relocated MP station, gate to prevent travel below the level of exit discharge etc.
|