Inspections for the day of: Monday, April 5, 2010.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00735 INSP-Final Inspection4/2/20104/5/20104/5/2010 3:57:45 PMPPASS
Permit finaled
FIR07-00261 INSP-Final Inspection4/2/20104/5/20104/5/2010 3:10:55 PMAPASS
Permit finaled.
FIR09-00017 INSP-Final Inspection4/5/20104/5/20104/5/2010 2:36:09 PMPFAIL
The AES panel only had a Netcon 6. No other items were inspected.
FIR09-00010 INSP-Final Inspection4/5/20104/5/20104/5/2010 2:35:26 PMPFAIL
The AES netcon was 5. All signals went out except after two attempts at sending an alarm signal out nothing was received by Paul at the monitoring station.
BLD10-00555 FIRE-Final Inspection4/1/20104/5/20104/5/2010 2:34:08 PMAFAIL
Repair the existing exit sign as marked on the plans, provide the occupant load sign for 80 people as discussed and provide re-certification for the hood suppression system once the new appliances have been installed.
BLD10-00395 FIRE-Final Inspection4/2/20104/5/20104/5/2010 12:00:04 PMAFAIL
One exit sign still did not operate. All the others as noted have been repaired.
FIR09-00069 INSP-Final Inspection4/5/20104/5/20104/5/2010 11:27:47 AMPPASS
permit finaled. As-builts provided
FIR09-00076 INSP-Final Inspection4/5/20104/5/20104/5/2010 10:52:08 AMPFAIL
Bryan and I could not get access to the facp and AES. No testing was performed.
FIR10-00096 INSP-Sprinkler Rough-in/Hydro4/2/20104/5/20104/5/2010 10:35:27 AMAPASS
The overhead hydro test passed and the earth quaking has been modified and trapeze hangers provided on the mains.
FIR09-00107 INSP-Final Inspection4/5/20104/5/20104/5/2010 10:17:02 AMPFAIL
The AES panel had a Netcon 5. The AES panel was being used as a stand alone facp which is not allowed due to listing. The city approved drawings showed a separate facp connected to the new AES panel. No testing other than the Netcon was performed.
FIR09-00109 INSP-Final Inspection4/5/20104/5/20104/5/2010 10:11:58 AMPFAIL
The panel had a Netcon 5. All signals were sent but "east PIV" kept coming in as a trouble signal on the annuciator and when the other tamper switches were activated "east tamper" supervisory stayed stuck on the annuciator even after being reset at the main facp and the annunciator.
FIR09-00069 INSP-Final Inspection4/5/20104/5/20104/5/2010 9:35:00 AMPFAIL
Everything tested ok. As-builts and a data sheet are needed that show the intella tap which was utilized on this project. The Netcon was a 5.
FIR09-00109 INSP-Sprinkler Rough-in/Hydro4/5/20104/5/20104/5/2010 8:38:52 AMPCANC
please call ###-#### with time Inspection requested from web by: Lori Brungardt Phone #: ###-#### Inspection cancelled from web by: Lori Brungardt
FIR09-00076 INSP-Final Inspection4/2/20104/5/20104/5/2010 8:20:15 AMACANC
The was no answer from the contact. No inspection was performed.
FIR09-00010 INSP-Final Inspection4/2/20104/5/20104/5/2010 8:19:59 AMACANC
The was no answer from the contact. No inspection was performed.
FIR09-00017 INSP-Final Inspection4/2/20104/5/20104/5/2010 8:18:18 AMACANC
Inspection canceled after repeated attempts to contact. I left message. No inspection performed.
FIR09-00109 INSP-Final Inspection4/2/20104/5/20104/5/2010 8:17:41 AMACANC
Inspection canceled after repeated attempts to contact. I left message. No inspection performed.
FIR09-00069 INSP-Final Inspection4/2/20104/5/20104/5/2010 8:16:36 AMACANC
Inspection canceled after repeated attempts to contact. I left message. No inspection performed.
FIR09-00107 INSP-Final Inspection4/2/20104/5/20104/5/2010 8:15:06 AMAFAIL
I spoke to Bryan at 7:43 to meet with him first thing. I waited at the project site until 8:15. There was no answer on his phone when I tried to re-contact him. No inspection was performed.