BLD09-01275
| BLD-Conference | 4/5/2010 | 4/5/2010 | 4/5/2010 5:00:26 PM | P | DONE |
|
|
Met on site with contractor to discuss ceiling grid issues. Will discuss with plan reviewer before proceeding further.
|
ESC06-00318
| Aging Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 4:35:53 PM | | DONE |
|
|
|
ESC06-00318
| DOC - Permit Expired | 4/5/2010 | 4/5/2010 | 4/5/2010 4:35:44 PM | P | PASS |
|
|
Final stabilization was completed. Pwermit is expired.
|
ESC05-00197
| Aging Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 4:34:44 PM | | DONE |
|
|
|
ESC05-00197
| DOC - Permit Expired | 4/5/2010 | 4/5/2010 | 4/5/2010 4:34:35 PM | P | PASS |
|
|
Final stabalization was completed. Permit is expired.
|
ESC10-00071
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 3:59:57 PM | P | PASS |
|
|
|
ESC10-00069
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 3:59:44 PM | P | PASS |
|
|
|
ESC10-00068
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 3:59:33 PM | P | PASS |
|
|
|
ESC10-00067
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 3:59:19 PM | P | PASS |
|
|
|
ESC10-00067
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 3:59:04 PM | P | PASS |
|
|
|
BLD10-00178
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 3:58:38 PM | P | CANC |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD10-00177
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 3:58:24 PM | P | CANC |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD10-00179
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 3:58:11 PM | P | NR |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD10-00176
| BLD-Framing/Rough-in | 4/5/2010 | 4/5/2010 | 4/5/2010 3:57:49 PM | P | NR |
|
|
jim - firewall construction Phone #: ###-####
|
BLD10-00277
| BLD-Framing/Rough-in | 4/5/2010 | 4/5/2010 | 4/5/2010 3:50:15 PM | P | PASS |
|
|
Base and face layers of 5/8 type x rock for 2hr. firewall, 1st. floor.
|
BLD10-00277
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 11:11:07 AM | A | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. 5/8 typex rock, for 2hr. firewall, base layer only, one side only. 1st. floor.
|
BLD10-00276
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 11:10:18 AM | A | PASS |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. 5/8 type x rock, base and face layers, 1st. floor.
|
ESC10-00121
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 11:08:27 AM | A | PASS |
|
|
|
ESC10-00120
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 11:08:13 AM | A | PASS |
|
|
|
BLD10-00279
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 11:07:34 AM | A | NR |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD10-00278
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 11:07:06 AM | A | NR |
|
|
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
|
BLD10-00183
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 10:58:33 AM | A | PASS |
|
|
Firewall at overbuilds Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
|
BLD10-00182
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 10:58:01 AM | A | PASS |
|
|
Firewall at overbuilds Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
|
BLD10-00181
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 10:57:34 AM | A | PASS |
|
|
Firewall at overbuild Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
|
BLD10-00180
| BLD-Framing/Rough-in | 4/2/2010 | 4/5/2010 | 4/5/2010 10:57:06 AM | A | PASS |
|
|
Firewall in overbuilds Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
|
ESC10-00075
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 10:52:24 AM | A | PASS |
|
|
|
ESC10-00074
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 10:52:05 AM | A | PASS |
|
|
|
ESC10-00073
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 10:51:47 AM | A | PASS |
|
|
|
ESC10-00072
| Random Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 10:51:26 AM | A | PASS |
|
|
|
BLD10-00387
| BLD-Final | 4/2/2010 | 4/5/2010 | 4/5/2010 8:57:18 AM | A | NR |
|
|
Chris-Please call prior to inspection Phone #: ###-####. Called and left message for Chris at above number and noted that he needed an electrical final prior to getting a building final.
|