Inspections for the day of: Monday, April 5, 2010.
Number of inspections: 30
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01275 BLD-Conference4/5/20104/5/20104/5/2010 5:00:26 PMPDONE
Met on site with contractor to discuss ceiling grid issues. Will discuss with plan reviewer before proceeding further.
ESC06-00318 Aging Inspection4/5/20104/5/20104/5/2010 4:35:53 PM DONE
ESC06-00318 DOC - Permit Expired4/5/20104/5/20104/5/2010 4:35:44 PMPPASS
Final stabilization was completed. Pwermit is expired.
ESC05-00197 Aging Inspection4/5/20104/5/20104/5/2010 4:34:44 PM DONE
ESC05-00197 DOC - Permit Expired4/5/20104/5/20104/5/2010 4:34:35 PMPPASS
Final stabalization was completed. Permit is expired.
ESC10-00071 Random Inspection4/5/20104/5/20104/5/2010 3:59:57 PMPPASS
ESC10-00069 Random Inspection4/5/20104/5/20104/5/2010 3:59:44 PMPPASS
ESC10-00068 Random Inspection4/5/20104/5/20104/5/2010 3:59:33 PMPPASS
ESC10-00067 Random Inspection4/5/20104/5/20104/5/2010 3:59:19 PMPPASS
ESC10-00067 Random Inspection4/5/20104/5/20104/5/2010 3:59:04 PMPPASS
BLD10-00178 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 3:58:38 PMPCANC
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD10-00177 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 3:58:24 PMPCANC
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD10-00179 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 3:58:11 PMPNR
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD10-00176 BLD-Framing/Rough-in4/5/20104/5/20104/5/2010 3:57:49 PMPNR
jim - firewall construction Phone #: ###-####
BLD10-00277 BLD-Framing/Rough-in4/5/20104/5/20104/5/2010 3:50:15 PMPPASS
Base and face layers of 5/8 type x rock for 2hr. firewall, 1st. floor.
BLD10-00277 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 11:11:07 AMAPASS
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. 5/8 typex rock, for 2hr. firewall, base layer only, one side only. 1st. floor.
BLD10-00276 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 11:10:18 AMAPASS
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####. 5/8 type x rock, base and face layers, 1st. floor.
ESC10-00121 Random Inspection4/5/20104/5/20104/5/2010 11:08:27 AMAPASS
ESC10-00120 Random Inspection4/5/20104/5/20104/5/2010 11:08:13 AMAPASS
BLD10-00279 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 11:07:34 AMANR
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD10-00278 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 11:07:06 AMANR
Firewall Construction Inspection requested from web by: James Larkin Phone #: ###-####
BLD10-00183 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 10:58:33 AMAPASS
Firewall at overbuilds Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
BLD10-00182 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 10:58:01 AMAPASS
Firewall at overbuilds Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
BLD10-00181 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 10:57:34 AMAPASS
Firewall at overbuild Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
BLD10-00180 BLD-Framing/Rough-in4/2/20104/5/20104/5/2010 10:57:06 AMAPASS
Firewall in overbuilds Inspection requested from web by: James Larkin Phone #: ###-####. Base and face layers of 5/8 typex rock for 2hr. fire wall, both sides, from ceiling to roof deck. Also verified installation of fire rated plywood at laydown parapet locations.
ESC10-00075 Random Inspection4/5/20104/5/20104/5/2010 10:52:24 AMAPASS
ESC10-00074 Random Inspection4/5/20104/5/20104/5/2010 10:52:05 AMAPASS
ESC10-00073 Random Inspection4/5/20104/5/20104/5/2010 10:51:47 AMAPASS
ESC10-00072 Random Inspection4/5/20104/5/20104/5/2010 10:51:26 AMAPASS
BLD10-00387 BLD-Final4/2/20104/5/20104/5/2010 8:57:18 AMANR
Chris-Please call prior to inspection Phone #: ###-####. Called and left message for Chris at above number and noted that he needed an electrical final prior to getting a building final.