ELE10-01480
| ELE-Aging Inspection | 4/5/2011 | 4/5/2011 | 4/6/2011 3:24:17 PM | | DONE |
|
|
electrical contractor will call for final
|
ESC10-00027
| Aging Inspection | 4/5/2011 | 4/5/2011 | 4/5/2011 3:44:08 PM | | CANC |
|
|
|
ESC10-00027
| Site Final | 4/5/2011 | 4/5/2011 | 4/5/2011 3:43:53 PM | P | PASS |
|
|
site clean, landscape all in ready for final
|
ELE10-01450
| ELE-Aging Inspection | 4/5/2011 | 4/5/2011 | 4/5/2011 3:23:04 PM | | DONE |
|
|
still under construction
|
ELE11-00588
| Electrical Rough-In | 4/5/2011 | 4/5/2011 | 4/5/2011 2:58:07 PM | P | PASS |
|
|
Cal Phone #: ###-#### >> Inspection requested via web by cal crosby rough-in ok bathroom/kitchen
|
ELE10-02134
| Electrical Rough-In | 4/5/2011 | 4/5/2011 | 4/5/2011 2:24:23 PM | P | PASS |
|
|
Chris is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok exterrior walls 3rd floor
|
ELE10-02072
| Electrical Rough-In | 4/5/2011 | 4/5/2011 | 4/5/2011 1:46:29 PM | P | CANC |
|
|
sean Phone #: ###-####
|
ELE10-02072
| Conference | 4/5/2011 | 4/5/2011 | 4/5/2011 1:46:07 PM | P | DONE |
|
|
discuss with home owner romex stapling,1 1/4 clearance from face of framing member, box fill, receptacle spacing, listed ceiling fan boxes,weather resistance receptacles,20 ampere bathroom receptacle circuit, inspections request
|
GCE11-00014
| GCE-Final | 4/4/2011 | 4/5/2011 | 4/5/2011 12:40:21 PM | A | PASS |
|
|
FinalTyler @ ###-#### final ok parking lot fixture-pole base
|
ELE11-00421
| Final | 4/4/2011 | 4/5/2011 | 4/5/2011 12:15:50 PM | P | PASS |
|
|
Danny Phone #: ###-#### final ok
|
ELE10-02676
| Electrical Rough-In | 4/4/2011 | 4/5/2011 | 4/5/2011 10:12:42 AM | A | PART |
|
|
This is a rough electrical inspection for the 2nd floor corridor and classrooms only. Please see Tom Hackman onsite for specific areas. Contact on job is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard partial cover for rough-in 2nd floor ok except stairwells
|
ELE11-00612
| Electrical Rough-In | 4/4/2011 | 4/5/2011 | 4/5/2011 9:27:31 AM | A | PASS |
|
|
Eddie Phone #: ###-#### rough-in ok bathroom remodel
|
ELE11-00424
| Final | 4/4/2011 | 4/5/2011 | 4/5/2011 9:17:08 AM | A | PASS |
|
|
jose Phone #: ###-#### final ok bathroom GFCI circuuit
|
ELE11-00608
| Electrical Rough-In | 4/4/2011 | 4/5/2011 | 4/5/2011 8:52:08 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by PAUL PINNEY rough-in ok listed motorized tub
|