Inspections for the day of: Tuesday, April 5, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00078 Aging Inspection4/5/20114/5/20114/5/2011 4:47:40 PM CANC
ESC10-00186 BMP Violation3/31/20114/5/20114/5/2011 4:47:14 PMAFAIL
Correction Notice:
Remove or maintain all high visabilty fence along Shoup Ave. Failure to comply within the given time frame will result in further enforcement. Will re-inspect on 4/7/2011AM.
ESC10-00611 General Inspection4/5/20114/5/20114/5/2011 2:34:06 PM PASS
waiting on vegitation growth.
ESC11-00001 General Inspection4/5/20114/5/20114/5/2011 2:33:00 PM PASS
ESC10-00894 General Inspection4/5/20114/5/20114/5/2011 2:31:45 PM FAIL
Correction Notice left on front window.
Post ESC sign at front of lot where visable from the street.
Give an updated phone number to the city where we can reach the RP. Failure to comply will result in further enforcement. Will re-inspect on 4/7/2011
ESC10-00922 General Inspection4/5/20114/5/20114/5/2011 2:25:45 PM FAIL
Verbal to RP:
Clean up all sediment off of the sidewalk at the corner. Maintain the sediment barrier perimeter controls. Post ESC sign where visable from the street. Will re-inspect on 4/7/2011AM.
ESC09-00676 General Inspection4/4/20114/5/20114/5/2011 1:04:02 PMPFAIL
Written Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Containerize all trash debris around the project area.
3. Install perimeter BMP controls on all slopes where there is disturb soil.
4. Provide a washout for all non storm water clean out.
Failure to comply with the given notice by 4/5/2011 PM will result in a stop work order. Will re-inspect on 4/6/2011.
ESC10-00850 Site Preparation4/4/20114/5/20114/5/2011 9:41:52 AMAPART
Verbal to RP:
Finish completing the stabilized construction exits. Install perimeter control when needed. ** Contact the city if ground water is encountered and dewatering is needed. Also need to see the narrative of the ESC plan. Will follow up tomorrow in the PM.