ELE16-00536
| Permanent Service | 4/5/2016 | 4/5/2016 | 4/5/2016 3:01:24 PM | P | FAIL |
|
|
Call half hour before // Larry Phone #: ###-#### 110.9 Interrupting Rating. Equipment intended to interrupt current at fault levels shall have an interrupting rating at nominal circuit voltage sufficient for the current that is available at the line terminals of the equipment. 10K installed 22K needed
|
ELE16-00303
| Electrical Rough-In | 4/5/2016 | 4/5/2016 | 4/5/2016 2:24:05 PM | P | PASS |
|
|
Wall cover inspection 3rd floor Phone #: ###-#### Inspection requested via web by Toby Groves Walls marked in green only rough in ok cover
|
ELE16-00904
| Electrical Rough-In | 4/5/2016 | 4/5/2016 | 4/5/2016 12:57:18 PM | P | PASS |
|
|
floor heat inspection in master bathroom Phone #: ###-#### Inspection requested via web by steve sellers Floor heat rough in ok cover
|
ELE16-01003
| Final | 4/4/2016 | 4/5/2016 | 4/5/2016 11:24:41 AM | A | FAIL |
|
|
Please call Dan Mitchell at ###-#### about 20 to 30 minutes before you arrive and he will meet you on site. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell See permanent service
|
ELE16-01003
| Permanent Service | 4/4/2016 | 4/5/2016 | 4/5/2016 11:23:04 AM | A | FAIL |
|
|
Please call Dan Mitchell at ###-#### about 20 to 30 minutes before you arrive and he will meet you on site. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell 230.95(C)- For services above 150 volts to ground but less than 1000 volts phase to phase overcurrent devices shall be performance tested when first set on site. 250.24- Unable to verify main bonding jumper to bond neutral.
|
ELE16-01003
| Electrical Rough-In | 4/4/2016 | 4/5/2016 | 4/5/2016 11:00:49 AM | A | FAIL |
|
|
Please call Dan Mitchell at ###-#### about 20 to 30 minutes before you arrive and he will meet you on site. Thank you! Phone #: ###-#### Inspection requested via web by Dan Mitchell See permanent service notes.
|
ELE16-01053
| Electrical Rough-In | 4/4/2016 | 4/5/2016 | 4/5/2016 10:40:01 AM | A | PASS |
|
|
Contractor will have someone on site by 9am. Homeowner should be home till 9am please call if inspection will be before 9am to confirm homeowner is still home. Thanks Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Kitchen, laundry, and lighting in nook, living, bar rough in ok cover.
|
ELE16-00997
| Rough-In Permanent Service | 4/4/2016 | 4/5/2016 | 4/5/2016 10:20:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Rough in ok cover p/s u/g n ok
|
ELE16-01035
| Temporary Service | 4/4/2016 | 4/5/2016 | 4/5/2016 9:50:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE16-01044
| Electrical Rough-In | 4/4/2016 | 4/5/2016 | 4/5/2016 9:17:45 AM | A | PASS |
|
|
Please inspect patio to room remodel. Phone #: ###-#### Inspection requested via web by ERIC CENTERS Walls and ceiling rough in ok cover
|
ELE16-01033
| Rough-In Permanent Service | 4/4/2016 | 4/5/2016 | 4/5/2016 8:36:16 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough in ok cover p/s u/g n ok
|