Inspections for the day of: Tuesday, April 5, 2016.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00544 BLD-Framing/Rough-in4/5/20164/5/20164/5/2016 4:43:32 PMPNR
Knows HVAC is missing furnaces but would like an inspection if you still will/can // Tom Phone #: ###-####
BLD16-00545 BLD-Framing/Rough-in4/5/20164/5/20164/5/2016 4:42:59 PMPNR
Knows HVAC is missing furnaces but would like an inspection if you still will/can // Tom Phone #: ###-####
BLD16-00183 BLD-Final4/5/20164/5/20164/5/2016 3:28:04 PMPNR
Dan Phone #: ###-####. Needs electrical final first.
BLD15-01225 BLD-Conference4/5/20164/5/20164/5/2016 2:26:22 PMPDONE
Permit is going to expire in five days and want to make sure none of the three concession stands have been started or completed before expiring the permits. BLD15-01223, 1224 and 1225. PEr David Moe with CM Co. this project is not going to happen. BK does not have the funds at this time. They are aware that the permit is going to expire.
BLD16-00940 BLD-Framing/Rough-in4/5/20164/5/20164/5/2016 2:14:08 PMPPASS
Sorin Phone #: ###-####
BLD15-03117 BLD-Footing4/5/20164/5/20164/5/2016 1:43:27 PMPPASS
Manual Phone #: ###-####. interior footing for garage/dwelling seperation wall.
BLD16-00299 BLD-Foundation4/4/20164/5/20164/5/2016 1:34:18 PMPPASS
Dane Phone #: ###-####
BLD16-00143 BLD-Energy code compliance4/4/20164/5/20164/5/2016 11:35:33 AMAPASS
Jose Phone #: ###-####
BLD16-00143 BLD-Framing/Rough-in4/4/20164/5/20164/5/2016 11:34:56 AMAPASS
Jose Phone #: ###-####
BLD16-00678 BLD-Footing4/1/20164/5/20164/5/2016 11:34:37 AMAPASS
Eric Phone #: ###-####
BLD16-00801 BLD-Framing/Rough-in4/4/20164/5/20164/5/2016 9:00:04 AMAPASS
Trey Phone #: ###-####