Inspections for the day of: Wednesday, April 5, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00823 INSP-Sprinkler Rough-in/Hydro4/5/20174/5/20174/5/2017 2:02:18 PMPPASS
Overhead hydro test passed.
FIR16-00824 INSP-Sprinkler Rough-in/Hydro4/5/20174/5/20174/5/2017 2:01:53 PMPPASS
Overhead hydro passed and tenting in apartments 203 and 204 passed and piping can be covered. However piping can not be covered on the first floor until approved plans have been received that show the underground pipe routing changes.
BLD16-02646 FIRE-Final Inspection4/4/20174/5/20174/5/2017 1:59:59 PMAFAIL
Need city approved drawings and small documents, needs address facing street, need riser room to be one hour rated, needs smoke alarms relocated to more than 3' from bathroom doors.
FIR16-00658 INSP-Final Inspection4/4/20174/5/20174/5/2017 1:58:47 PMAPASS
Permit finaled
FIR16-00721 INSP-Final Inspection4/4/20174/5/20174/5/2017 1:58:19 PMAPASS
Permit finaled
FIR17-00128 INSP-Final Inspection4/4/20174/5/20174/5/2017 1:57:55 PMAPASS
Permit finaled
FIR16-00284 INSP-Sprinkler Rough-in/Hydro4/4/20174/5/20174/5/2017 9:51:52 AMAPASS
Hydro test on the standpipes; the parking garage passed. I also did a rough-in on the standpipes and only found one floor clamp missing.
BLD17-00486 FIRE-Final Inspection4/4/20174/5/20174/5/2017 8:45:36 AMAFAIL
Called and left message on contact voice mail and then met Brian with Lighting Electric to test the smoke evac system but we could not gain access to the tenant space. I called the contact and left another message that he would need to reschedule.
FIR16-00284 INSP-Sprinkler Rough-in4/4/20174/5/20174/5/2017 8:07:57 AMAPASS