FIR16-00823
| INSP-Sprinkler Rough-in/Hydro | 4/5/2017 | 4/5/2017 | 4/5/2017 2:02:18 PM | P | PASS |
|
|
Overhead hydro test passed.
|
FIR16-00824
| INSP-Sprinkler Rough-in/Hydro | 4/5/2017 | 4/5/2017 | 4/5/2017 2:01:53 PM | P | PASS |
|
|
Overhead hydro passed and tenting in apartments 203 and 204 passed and piping can be covered. However piping can not be covered on the first floor until approved plans have been received that show the underground pipe routing changes.
|
BLD16-02646
| FIRE-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 1:59:59 PM | A | FAIL |
|
|
Need city approved drawings and small documents, needs address facing street, need riser room to be one hour rated, needs smoke alarms relocated to more than 3' from bathroom doors.
|
FIR16-00658
| INSP-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 1:58:47 PM | A | PASS |
|
|
Permit finaled
|
FIR16-00721
| INSP-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 1:58:19 PM | A | PASS |
|
|
Permit finaled
|
FIR17-00128
| INSP-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 1:57:55 PM | A | PASS |
|
|
Permit finaled
|
FIR16-00284
| INSP-Sprinkler Rough-in/Hydro | 4/4/2017 | 4/5/2017 | 4/5/2017 9:51:52 AM | A | PASS |
|
|
Hydro test on the standpipes; the parking garage passed. I also did a rough-in on the standpipes and only found one floor clamp missing.
|
BLD17-00486
| FIRE-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 8:45:36 AM | A | FAIL |
|
|
Called and left message on contact voice mail and then met Brian with Lighting Electric to test the smoke evac system but we could not gain access to the tenant space. I called the contact and left another message that he would need to reschedule.
|
FIR16-00284
| INSP-Sprinkler Rough-in | 4/4/2017 | 4/5/2017 | 4/5/2017 8:07:57 AM | A | PASS |
|
|
Rough to cover for units 304 and 208 passed. All piping in the apartments can be covered.
|