BLD01-00240
| BLD-Framing/Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | CANC |
|
|
###-####
|
BLD00-01182
| BLD-Final | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | FAIL |
|
|
fn occ dwayne ###-####--for access on gar 1001enter c/n posted notes apply to both 2132 & 2136 4/6/2001 10:46:42 AM
|
BLD00-01181
| BLD-Final | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | FAIL |
|
|
dwayne ###-#### gar code 1001enter-fn occ landinds exterior36 min/saftey glazing/handrail sopport. 4/6/2001 10:45:43 AM
|
BLD98-03479
| FIRE-Final Inspection | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | CANC |
|
|
|
BLD01-00197
| BLD-Framing/Rough-in | 4/4/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PART |
|
|
###-#### placed with special insp. pending report. 4/6/2001 9:23:36 AM
|
BLD00-03516
| BLD-Footing | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 15:58:54. Contact: ###-####. jach called rained out. 4/6/2001 9:15:00 AM
|
BLD01-00240
| BLD-Other | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 4/6/2001 9:40:39 AM celling ok for cover.
|
BLD01-00038
| BLD-Conference | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | FAIL |
|
|
Report of not following approved plans. Issue SWO for permit holder to contact P&Z and plan review regarding changes./ stop work posted no one on site. contacted office to put hold on permit insp. . 4/6/2001 2:31:53 PM
|
BLD00-03542
| BLD-Footing | 4/4/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 09:42:00. Contact: ###-####.
|
BLD99-01725
| BLD-Final | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 11:10:09. Contact: ###-####. temp ok pending plm for perm sign off. 4/6/2001 3:58:14 PM
|
BLD01-00810
| BLD-Framing/Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
fr -demisng wall gene ###-####--CANCEL PER GENE
|
BLD01-00248
| BLD-Footing | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
DAN-- ###-#### -RE-INSP
|
BLD00-01563
| BLD-Concrete | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 06:38:24. Contact: ###-####.
|
BLD99-02179
| BLD-Framing/Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 14:33:47. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/06/2001 at 07:08:49.
|