BLD01-00730
| BLD-Foundation | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PART |
|
|
###-#### steel in, no plan 4/6/2001 12:27:32 PM
|
BLD01-00161
| BLD-Framing/Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | FAIL |
|
|
shear insp brian ###-#### no address or plans 4/6/2001 12:01:04 PM
|
MEC01-01004
| Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PART |
|
|
Greg ###-####; c/n: horizontal run of flue exceeds 75% of height per 805 UMC. 4/6/2001 11:26:35 AM
|
MEC01-01004
| Final | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | NR |
|
|
Greg ###-####
|
BLD01-00572
| BLD-Footing | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 16:37:40. Contact: . unable to contact , no work apparent 4/6/2001 11:31:04 AM
|
MEC01-00976
| Final | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 06:09:28. Contact: ###-####.
|
MEC01-00927
| Final | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 06:09:58. Contact: ###-####. need clarify termination req's at roof...written shows 3', diagram 18" to wall near flue. ???c/n 4/6/2001 11:29:53 AM
|
MEC01-00981
| Conference | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 4/6/2001 10:08:31 AM w/ TML re c/n, need piping diagram, tracer wire & listing
|
BLD01-00572
| BLD-Footing | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 4/6/2001 11:48:03 AM ext wall ftgs ok, steel inplace
|
BLD00-03659
| BLD-Conference | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 4/6/2001 5:17:49 PM w/ Bob Cafferty re Albertsons plant; eng'r to submit proposal to remove accumulator and mount on roof and justify same per UMC, UFC.
|
BLD00-01564
| BLD-Final | 4/4/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/04/2001 at 16:58:13. Contact: ###-####. need elec ok, verify frame c/n 4/6/2001 5:02:29 PM
|
MEC01-00462
| Final | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 09:32:39. Contact: ###-####. need protection post, no access underfloor. c/n 4/6/2001 5:03:07 PM
|
BLD01-00643
| BLD-Framing/Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | FAIL |
|
|
David ###-####, c/n, need eng'd plans, show connections as need 4/6/2001 1:56:11 PM
|
BLD00-03031
| BLD-Final | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | FAIL |
|
|
JOHN ###-#### FN c/n , complete ext finish, extend / install rails, door hdwe 4/6/2001 2:29:49 PM 4/6/2001 2:30:48 PM
|