PLM01-00948
| Sprinkler (Final) | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 09:13:57. Contact: ###-####.
|
PLM01-01000
| Water and/or Sewer | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | CANC |
|
|
swr & water shawn -###-####
|
PLM01-01001
| Plumbing Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | FAIL |
|
|
Bryan ###-####pex not approved for relief line also relief line to be graded except in this case must be graded 4/6/2001 11:44:47 AM om 4/6/2001 11:44:59 AMfrom higest point above water heater to outside 1/8" hole to be drilled at lowest point 4/6/2001 11:47:14 AM
|
PLM01-01000
| Other | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 352 On 4/6/2001 10:31:03 AM mh hookup 4/6/2001 10:31:38 AM
|
PLM01-00988
| Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
LATE PM\\###-####
|
PLM01-01010
| Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/06/2001 at 11:17:54. Contact: ###-####.ground work and roughin 4/6/2001 1:46:35 PM
|
PLM01-01001
| Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 352 On 4/6/2001 11:49:08 AM
|
PLM01-01003
| Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
###-####-- betty r/i
|