PLM01-00999
| Sprinkler (Final) | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PASS |
|
|
spr -carol ###-####
|
PLM01-01002
| Sprinkler (Final) | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-00547
| Final | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 16:53:35. Contact: ###-####.
|
PLM01-00280
| Final | 4/5/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/05/2001 at 17:11:55. Contact: ###-####. temp. occupancy ok need to pipe discharge from RP to outside of building finish caulking fixture's fix leak on RP 4/6/2001 3:46:59 PM
|
PLM01-00753
| Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
SCOTT ###-#### --BACK IS OPEN FOR ACCESS R/I
|
PLM01-01011
| Plumbing Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 12:00:00 AM | P | PASS |
|
|
R/I-- CRAIG-- ###-####
|