Inspections for the day of: Tuesday, April 6, 2004.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00004 FIR-Aging Inspection4/6/20044/6/20044/6/2004 12:00:00 AM NR
work in progress 4/6/2004 8:19:09 AM
FIR04-00004 FIR-Aging Inspection4/6/20044/6/20044/6/2004 12:00:00 AM NR
work in progress 4/6/2004 8:19:09 AM
FIR04-00206 INSP-Sprinkler Rough-in/Hydro4/6/20044/6/20044/6/2004 12:00:00 AMAFAIL
No approved plans on site
BLD04-00237 FIRE-Final Inspection4/6/20044/6/20044/6/2004 12:00:00 AMAPASS
Fire life safety finaled
BLD04-00237 FIRE-Final Inspection4/6/20044/6/20044/6/2004 12:00:00 AMAPASS
Fire life safety finaled
FIR03-00648 INSP-Final Inspection4/5/20044/6/20044/6/2004 12:00:00 AMAPASS
Fire alarm finaled 4/6/2004 12:05:50 PM
BLD04-00207 FIRE-Final Inspection4/5/20044/6/20044/6/2004 12:00:00 AMAFAIL
Halie; Phone #: ###-#### Mount and tag the fire extinguisher on the first floor and provide one for the second floor. Remove thumbturn from the main entry/exit (keyed both sides OK). Remove thumbturn from the rear exit. Provide approved door hardware on all doors. See note #4 on building review for limit. 4/6/2004 12:04:28 PM
BLD03-02663 FIRE-Final Inspection4/5/20044/6/20044/6/2004 12:00:00 AMAPASS
Fire life safety finaled 4/6/2004 12:01:12 PM
FIR04-00181 INSP-Final Inspection4/5/20044/6/20044/6/2004 12:00:00 AMAPASS
Hood suppression system operated correctly 4/6/2004 12:00:06 PM
FIR04-00181 INSP-Final Inspection4/5/20044/6/20044/6/2004 12:00:00 AMAPASS
Hood suppression system operated correctly 4/6/2004 12:00:06 PM
FIR04-00182 INSP-Final Inspection4/5/20044/6/20044/6/2004 12:00:00 AMAPASS
Hood suppression system operated correctly 4/6/2004 12:00:21 PM
FIR04-00182 INSP-Final Inspection4/5/20044/6/20044/6/2004 12:00:00 AMAPASS
Hood suppression system operated correctly 4/6/2004 12:00:21 PM
FIR03-00780 INSP-Sprinkler Rough-in/Hydro4/5/20044/6/20044/6/2004 12:00:00 AMAPASS
24 hour air test passed 10/15/2003 11:24:50 PM
BLD03-01026 FIRE-Final Inspection4/6/20044/6/20044/6/2004 12:00:00 AMPPASS
Fire life safety finaled
FIR04-00136 INSP-Final Inspection4/6/20044/6/20044/6/2004 12:00:00 AMPPASS
Fire sprinklers finaled
BLD03-03068 FIRE-Final Inspection4/6/20044/6/20044/6/2004 12:00:00 AMPPASS
Fire life safety finaled
FIR04-00079 INSP-Sprinkler Rough-in4/6/20044/6/20044/6/2004 12:00:00 AMPPART
2nd floor sprinkler rough-in is ok. Add earth quake bracing to main 10/15/2003 11:36:41 PM