MEC05-00798
| Final | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
MEC05-01056
| Rough-in | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | A | PASS |
|
|
REINSPECT READY FOR LATE AM; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL 60lb test to all equipment ok..will need reg at furn attic at final 4/6/2005 11:10:04 AM
|
MEC04-03673
| Final | 4/6/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Matt Hansen
|
MEC05-00862
| Conference | 4/6/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | PASS |
|
|
please give Dustin Rich a call to schedule conference. for today if possible.; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
|
MEC05-00492
| Rough-in | 4/6/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/6/2005 at 9:19:49 AM. Contact: ###-####. type 2 hoods ok in shaft..welds on type 1 hood ok except for 2' horiz section..stan will grind down burrs 4/6/2005 4:10:38 PM
|
MEC05-00810
| Rough-in | 4/6/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | PART |
|
|
grease duct inspection please///jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore inside of duct has some slag and burrs..voiced concern about clearance to wrap duct without smashing wrap again combustibles overhead..ok to wrap duct 4/6/2005 4:12:20 PM
|
MEC05-00801
| Rough-in | 4/6/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | CANC |
|
|
THANKS, ANDREA.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek Dixie ran out of time so Tera called and changed to tomorrow///4/6/05 4:10pm BAS
|
MEC05-00841
| Rough-in | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 3:09:44 PM. Contact: ###-####. main trunks sealed and insulated 4/6/2005 4:09:03 PM
|
MEC05-01086
| Final | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | FAIL |
|
|
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister called pager #...no response 4/6/2005 4:26:43 PM
|
MEC04-03456
| Final | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 3:12:40 PM. Contact: ###-####....2nd floor west side ok for tile 4/6/2005 4:08:39 PM
|
MEC05-01038
| Final | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | NH |
|
|
retro install, please do rough and final at same time.; Phone #: ###-#### Internet Inspection Request from: Mya Matheson...###-#### roy 4/6/2005 1:39:36 PM no message machine...called mike 4/6/2005 1:39:55 PM
|
MEC05-00442
| Conference | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | CANC |
|
|
per your request out of time..rescheduled 4/6/2005 4:26:02 PM
|
MEC05-00972
| Pressure Test | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 4:59:14 PM. Contact: ###-####.
|
MEC05-01072
| Pressure Test | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | CANC |
|
|
late pm ?? bill-- ###-####///cancel per bill 11:45am 4/6/05 BAS
|
MEC05-01083
| Pressure Test | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | NH |
|
|
marco ###-#### --call 1st before insp..off curtis before tracks 4/6/2005 1:21:11 PM..called and left message to call me for access 4/6/2005 1:21:36 PM left message..no time to wait around 4/6/2005 1:40:28 PM
|
MEC05-01083
| Final | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | FAIL |
|
|
marco ###-#### --call 1st before insp
|
MEC05-01084
| Rough-in | 4/5/2005 | 4/6/2005 | 4/6/2005 12:00:00 AM | P | NR |
|
|
john ###-#### unable to meet up with john...they will reschedule 4/6/2005 4:26:25 PM
|