Inspections for the day of: Thursday, April 6, 2006.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02930 BLD-Concrete4/6/20064/6/20064/6/2006 4:46:17 PMPPART
Scheduled by a contractor via Hello! on 4/6/2006 at 8:00:12 AM. Contact: ###-####. bond beam ok above winow front si on file.
BLD06-00588 BLD-Footing4/5/20064/6/20064/6/2006 2:43:14 PMPPASS
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD05-02523 BLD-Energy code compliance4/5/20064/6/20064/6/2006 11:46:04 AMAPASS
Josh; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD05-02521 BLD-Energy code compliance4/5/20064/6/20064/6/2006 10:56:43 AMAPASS
Josh; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD05-02068 BLD-Energy code compliance4/6/20064/6/20064/6/2006 10:04:32 AMAFAIL
Scheduled by a contractor via Hello! on 4/6/2006 at 6:04:20 AM. Contact: ###-####. nr
BLD05-02071 BLD-Energy code compliance4/6/20064/6/20064/6/2006 9:51:37 AMAPASS
Scheduled by a contractor via Hello! on 4/6/2006 at 6:12:52 AM. Contact: ###-####.
BLD05-02236 BLD-Framing/Rough-in4/5/20064/6/20064/6/2006 9:09:14 AMAPART
Scheduled by a contractor via Hello! on 4/4/2006 at 4:29:46 PM. Contact: ###-#### colum need evalation by engineer/ blk and nail roof diaphram. ok to insulate.
BLD05-02163 BLD-Framing/Rough-in4/6/20064/6/20064/6/2006 9:02:28 AMPPART
Scheduled by a contractor via Hello! on 4/6/2006 at 8:09:09 AM. Contact: ###-####.need colum evauation by engineer two locations/ need toblk and nai roof diapham. ok to insulate.
BLD05-02163 BLD-Framing/Rough-in4/5/20064/6/20064/6/2006 8:46:41 AMAFAIL
Scheduled by a contractor via Hello! on 4/5/2006 at 7:50:49 AM missing hangers on 1/2 gr. strap at top plate above fire place.