Inspections for the day of: Friday, April 6, 2007.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00119 Site Preparation4/5/20074/6/20074/6/2007 12:54:49 PMAPASS
Site looks good, all bmp's are being maintained.
ESC07-00144 BMP Violation4/6/20074/6/20074/6/2007 10:59:26 AMPFAIL
c/n issued to address previous violations that have not been addressed. access control needed along Targee, construction entrance needed and ESC sign needs to be better secured. Issues must be addressed by 4-9-07 or further enforcement will occur.
ESC06-01142 BMP Violation4/6/20074/6/20074/6/2007 10:22:30 AMPFAIL
Verbal c/n to RP. Trash maintenance needed on site and construction fence along Warm Springs needs repaired. Left vm for developer as well. Issues must be completed by the end of the weekend.
ESC06-01141 BMP Violation4/6/20074/6/20074/6/2007 10:22:10 AMPFAIL
Verbal c/n to RP. Trash maintenance needed on site and construction fence along Warm Springs needs repaired. Left vm for developer as well. Issues must be completed by the end of the weekend.
ESC06-01143 BMP Violation4/6/20074/6/20074/6/2007 10:21:53 AMPFAIL
Verbal c/n to RP. Trash maintenance needed on site and construction fence along Warm Springs needs repaired. Left vm for developer as well. Issues must be completed by the end of the weekend.
ESC06-01142 Site Preparation4/5/20074/6/20074/6/2007 10:19:14 AMACANC
Scheduled by SGW:
ESC04-00201 Site Final4/6/20074/6/20074/6/2007 10:19:05 AMPPASS
Final stablization has been completed.
ESC06-00294 Site Final4/6/20074/6/20074/6/2007 10:18:18 AMPPASS
Final stablization has been completed.
ESC04-00200 Site Final4/6/20074/6/20074/6/2007 10:18:00 AMPPASS
Final stablization has been completed.
ESC04-00189 Site Final4/6/20074/6/20074/6/2007 10:17:43 AMPPASS
Final stablization has been completed.