BLD09-02299
| FIRE-Conference | 4/6/2010 | 4/6/2010 | 4/7/2010 7:55:32 AM | P | DONE |
|
|
I received a phone call and an email from Patrick the architect about the Kraft backing on the insulation. I deferred him to the building plan reviewer and the structural inspector for any approvals.
|
BLD10-00228
| FIRE-Conference | 4/5/2010 | 4/6/2010 | 4/7/2010 7:51:44 AM | A | DONE |
|
|
The builder was questioning door hardware on the southwest exit door. Single action is required and the thumbturn dead bolt needs to be removed.
|
BLD10-00395
| FIRE-Final Inspection | 4/6/2010 | 4/6/2010 | 4/6/2010 2:50:17 PM | P | PASS |
|
|
Life safety passed
|
BLD10-00649
| FIRE-Final Inspection | 4/6/2010 | 4/6/2010 | 4/6/2010 2:49:47 PM | P | FAIL |
|
|
Provide annual inspection for the fire extinguisher, provide address as discussed and cover the exposed electrical outlets.
|
FIR09-00013
| INSP-Final Inspection | 4/5/2010 | 4/6/2010 | 4/6/2010 11:23:42 AM | A | FAIL |
|
|
The AES panel only had a Netcon 6. No inspection performed.
|
FIR09-00012
| INSP-Final Inspection | 4/5/2010 | 4/6/2010 | 4/6/2010 11:23:27 AM | A | FAIL |
|
|
The AES panel only had a Netcon 6. No inspection performed.
|
FIR10-00141
| INSP-Sprinkler Rough-in | 4/5/2010 | 4/6/2010 | 4/6/2010 11:22:36 AM | A | FAIL |
|
|
Four pendant heads exceed the maximum calculated of 8' off of walls. Also the underground sprinkler piping is poly plastic not copper as per the drawings. Also the area marked "Storage" is now an exterior covered patio with the sprinkler protection deleted.
|
FIR10-00139
| INSP-Sprinkler Rough-in | 4/5/2010 | 4/6/2010 | 4/6/2010 11:20:37 AM | A | FAIL |
|
|
Per the city approved plans the new branchline that feeds the two new pendants is to be sized at 1 1/4". It has been installed as a 1 1/4" starter piece and then reduces to 1".
|