FIR08-00378
| FIR-Aging Inspection | 4/6/2011 | 4/6/2011 | 4/14/2011 3:07:21 PM | | NR |
|
|
I left a voice mail for Ken Webster, Allied General, requesting project status and/or Allied's responcibility.
|
FIR10-00513
| INSP-Sprinkler Rough-in | 4/6/2011 | 4/6/2011 | 4/7/2011 1:59:19 PM | P | PASS |
|
|
the earthquake bracing has been corrected and the front canopy has been reduced to less than 160 cubic feet
|
FIR10-00543
| INSP-Supply line flush | 4/5/2011 | 4/6/2011 | 4/7/2011 7:10:47 AM | A | PASS |
|
|
underground flush passed
|
BLD09-01916
| FIRE-Final Inspection | 4/5/2011 | 4/6/2011 | 4/6/2011 10:41:31 AM | A | PASS |
|
|
Life safety passed.
|