Inspections for the day of: Wednesday, April 6, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00038 General Inspection4/6/20114/6/20114/7/2011 2:57:49 PM CANC
ESC11-00049 General Inspection4/6/20114/6/20114/6/2011 3:43:28 PM PASS
ESC10-00850 General Inspection4/5/20114/6/20114/6/2011 3:42:21 PMPDONE
Made the contractor aware that no work pass the right away is allowed until an approved narrative and plan are produced and another site prep inspection occurs.

Dewatering on the lot is allowed but no water is allowed on any of the ajacent properrties. Will follow up on 4/72011AM.
ESC11-00028 Site Preparation3/30/20114/6/20114/6/2011 3:37:58 PMAFAIL
Verbal to RP:
Extend the construction exit to the hard surface. Also post ESC sign at the front of project where it is visable from the street. Will re-inspect on 4/8/2011AM.
ESC11-00099 General Inspection4/6/20114/6/20114/6/2011 3:29:14 PM PASS
ESC10-00040 Site Preparation3/30/20114/6/20114/6/2011 2:21:18 PMAPART
Verbal to Assistant PM:
Clean up back section of parking lot, remove the sediment barrier. Contact the city for a Site Final inspection once the disturbed area has acheived a uniform coverage of vegitation on all distubed area.
ESC11-00027 Site Preparation4/1/20114/6/20114/6/2011 1:49:14 PMAPART
Verbal to RP:
Post ESC sign where vidable from the street.
ESC10-00600 General Inspection4/6/20114/6/20114/6/2011 9:03:39 AM PASS
All cocnut blanket is install in the correct method.
Waiting on soil to dry up to track walk the slopes and flat grade prior to hydroseeding.
ESC11-00177 General Inspection4/6/20114/6/20114/6/2011 8:46:40 AM CANC
ESC11-00177 DOC - Permit Finaled4/6/20114/6/20114/6/2011 8:46:21 AMPPASS
ESC09-00676 BMP Violation4/5/20114/6/20114/6/2011 8:45:57 AMAPART
Most sediment barriers are in place. Still picking up trash debris through out the project area.