PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, April 6, 2011
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC11-00038
General Inspection
4/6/2011
4/6/2011
4/7/2011 2:57:49 PM
CANC
ESC11-00049
General Inspection
4/6/2011
4/6/2011
4/6/2011 3:43:28 PM
PASS
ESC10-00850
General Inspection
4/5/2011
4/6/2011
4/6/2011 3:42:21 PM
P
DONE
Made the contractor aware that no work pass the right away is allowed until an approved narrative and plan are produced and another site prep inspection occurs.
Dewatering on the lot is allowed but no water is allowed on any of the ajacent properrties. Will follow up on 4/72011AM.
ESC11-00028
Site Preparation
3/30/2011
4/6/2011
4/6/2011 3:37:58 PM
A
FAIL
Verbal to RP:
Extend the construction exit to the hard surface. Also post ESC sign at the front of project where it is visable from the street. Will re-inspect on 4/8/2011AM.
ESC11-00099
General Inspection
4/6/2011
4/6/2011
4/6/2011 3:29:14 PM
PASS
ESC10-00040
Site Preparation
3/30/2011
4/6/2011
4/6/2011 2:21:18 PM
A
PART
Verbal to Assistant PM:
Clean up back section of parking lot, remove the sediment barrier. Contact the city for a Site Final inspection once the disturbed area has acheived a uniform coverage of vegitation on all distubed area.
ESC11-00027
Site Preparation
4/1/2011
4/6/2011
4/6/2011 1:49:14 PM
A
PART
Verbal to RP:
Post ESC sign where vidable from the street.
ESC10-00600
General Inspection
4/6/2011
4/6/2011
4/6/2011 9:03:39 AM
PASS
All cocnut blanket is install in the correct method.
Waiting on soil to dry up to track walk the slopes and flat grade prior to hydroseeding.
ESC11-00177
General Inspection
4/6/2011
4/6/2011
4/6/2011 8:46:40 AM
CANC
ESC11-00177
DOC - Permit Finaled
4/6/2011
4/6/2011
4/6/2011 8:46:21 AM
P
PASS
ESC09-00676
BMP Violation
4/5/2011
4/6/2011
4/6/2011 8:45:57 AM
A
PART
Most sediment barriers are in place. Still picking up trash debris through out the project area.