FIR15-00709
| INSP-Sprinkler Rough-in | 4/6/2016 | 4/6/2016 | 4/6/2016 2:21:50 PM | P | DONE |
|
|
Today was more of a conference. Robert and I discussed earth quake bracing attachment for the stand pipes. He also relocated the pendant in the Roof Access room for better coverage.
|
FIR15-00822
| INSP-Sprinkler Rough-in | 4/6/2016 | 4/6/2016 | 4/6/2016 2:01:16 PM | P | PASS |
|
|
See the city approved plans for piping marked "ok" whre piping above hard lids can be covered.
|
BLD16-00332
| FIRE-Conference | 4/6/2016 | 4/6/2016 | 4/6/2016 1:17:53 PM | P | DONE |
|
|
The builder contacted me to ask what size of access door would be required for access to the existing anti-freeze loop equipment. I referred him to IFC 509.3
|
FIR16-00226
| INSP-Sprinkler Rough-in | 4/5/2016 | 4/6/2016 | 4/6/2016 10:46:01 AM | A | PASS |
|
|
Piping above hard lids is ok to cover.
|
BLD16-00619
| FIRE-Final Inspection | 4/5/2016 | 4/6/2016 | 4/6/2016 10:36:17 AM | A | FAIL |
|
|
Need city approved plans and notes, need ceiling tile installed for the sprinkler heads, need doors and hardware installed, need fire alarm modifications due to the new corridor addition.
|
FIR16-00153
| INSP-Final Inspection | 4/5/2016 | 4/6/2016 | 4/6/2016 10:32:25 AM | A | FAIL |
|
|
Ceiling tile not installed yet.
|