Inspections for the day of: Wednesday, April 6, 2016.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00183 BLD-Final4/6/20164/6/20164/6/2016 3:35:41 PMPNR
Dan Phone #: ###-####. Still needs electrcial final.
BLD16-00648 BLD-Wall cover4/5/20164/6/20164/6/2016 2:53:35 PMPPASS
Shear // Zane Phone #: ###-####
BLD16-00545 BLD-Framing/Rough-in4/6/20164/6/20164/6/2016 2:26:59 PMPNR
Tom-hvac to be done AM today Phone #: ###-####. Mech. rough in inspection failed.
BLD16-00544 BLD-Framing/Rough-in4/6/20164/6/20164/6/2016 2:11:06 PMPFAIL
Tom Phone #: ###-####-HVAC to be done AM. Fireblock barrell vault. Correction notice posted. Ok to insulate.
BLD16-00047 BLD-Framing/Rough-in4/6/20164/6/20164/6/2016 1:23:54 PMPNR
Brett Phone #: ###-####. Mech. and plumbing rough in inspections have failed.
ESC15-01622 Site Final4/6/20164/6/20164/6/2016 1:22:14 PMPPASS
ESC15-01622 DOC - Permit Finaled4/6/20164/6/20164/6/2016 1:22:05 PMPPASS
BLD15-04497 BLD-Final4/6/20164/6/20164/6/2016 1:21:54 PMPPASS
Joe Phone #: ###-####
BLD15-04497 DOC - Permit Finaled4/6/20164/6/20164/6/2016 1:21:43 PMPPASS
All issues resolved.
BLD15-03117 BLD-Foundation4/5/20164/6/20164/6/2016 11:25:26 AMAPASS
As late as possible /// Manuel Phone #: ###-####
BLD15-03753 BLD-Footing4/5/20164/6/20164/6/2016 9:06:28 AMAPART
Terry Phone #: ###-####
ESC15-01369 Site Preparation4/6/20164/6/20164/6/2016 9:05:55 AMAPASS
BLD16-00639 BLD-Wall Bracing4/5/20164/6/20164/6/2016 8:35:21 AMAPASS
Lane Phone #: ###-####