Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GRD17-00082 FIRE-Final Inspection4/5/20184/6/20184/10/2018 7:18:02 AMPPASS
Life safety passed. Both gates have been modified for the 20' width

At Quality Electric offices. Contact is either Don Rye or Jay Hintze. Phone #: ###-#### Inspection requested via web by Scott Campbell
FIR18-00242 INSP-Final Inspection4/5/20184/6/20184/6/2018 1:39:44 PMPPASS
Permit finaled
FIR17-00460 INSP-Final Inspection4/5/20184/6/20184/6/2018 1:22:15 PMPCANC
Unable to test the sprinkler devices due to fire alarm issues. Contractor needs to verify that the shipping clips have been removed from heads.
FIR17-00461 INSP-Final Inspection4/5/20184/6/20184/6/2018 1:22:01 PMPCANC
Unable to test the sprinkler devices due to fire alarm issues. Contractor needs to verify that the shipping clips have been removed from heads.
FIR17-00493 INSP-Final Inspection4/5/20184/6/20184/6/2018 1:20:53 PMPFAIL
Resubmit plans showing the correct dialer/communicator and the correct zone arrangement. Will need to test all devices.
FIR17-00492 INSP-Final Inspection4/5/20184/6/20184/6/2018 1:20:32 PMPFAIL
Resubmit plans showing the correct dialer/communicator and the correct zone arrangement. Will need to test all devices.
BLD18-00584 FIRE-Final Inspection4/6/20184/6/20184/6/2018 12:32:34 PMPPASS
Life safety passed. Contractor is going to install the correct single action hardware on the doors as discussed.

Elliot Phone #: ###-####
FIR17-00668 INSP-Final Inspection4/4/20184/6/20184/6/2018 10:54:09 AMAFAIL
The head end equipment was tested. Netcon was a 5. Batteries match and a dedicated circuit has been provied. No sprinkler devices have been tested due to the sprinkler contractor not showing up. We tested duct smoke detectors in multiple tenant spaces and I noted in one space the duct smoke detector did not shut down immediatley as required. Also plan modifications are needed to show the notification devices in the two riser rooms and through out the day care. The ground wire for the AES has not been installed either.

Laura -call for access--owner and Jim from American Fire, and keith, colliers, peter from crane alarm Phone #: ###-####
BLD17-04482 FIRE-Final Inspection4/5/20184/6/20184/6/2018 9:46:05 AMAPART
Partial life safety final for phase I (CT#2 Room/Control Room) is complete. There is a sync issue with the project related fire alarm permit that will need to be addressed prior to a final sign off.


Please call Ami when on site. Phone #: ###-#### Inspection requested via web by Ami Tracy
FIR18-00258 INSP-Final Inspection4/5/20184/6/20184/6/2018 9:44:28 AMAPART
Phase one (CT#2 Room/Control Room) fire alarm work is complete except there is a audible sync issue and it appears that a visual sync issue. The sync issues will need to be addressed prior to a final sign off.

Brian Phone #: ###-####
FIR18-00243 INSP-Final Inspection4/5/20184/6/20184/6/2018 9:42:42 AMAPART
Phase one (CT#2 Room/Control Room) fire sprinkler work is complete.

Please Call Adam With Time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham