FIR20-00186
| INSP-Sprinkler Rough-in | 4/6/2020 | 4/6/2020 | 4/6/2020 4:03:41 PM | P | FAIL |
|
|
Installation does not match plans. Two heads have been piped from the same 1" outlet. Install per plans or provide calculations proving the two heads work as discussed.
Please call Barry when you are on your way. Phone #: ###-#### Inspection requested via web by Connie Danes
|
FIR19-00489
| INSP-Final Inspection | 4/6/2020 | 4/6/2020 | 4/6/2020 2:44:46 PM | P | PART |
|
|
Forward flush passed. The interconnection with the fire alarm system was not ready for inspection.
Todd Ketterling is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR20-00186
| INSP-Sprinkler Rough-in | 4/3/2020 | 4/6/2020 | 4/6/2020 8:54:28 AM | A | FAIL |
|
|
I let jim know I was on the way. Waited at the project site 25 minutes and then left. Inspection will need to be rescheduled. Phone #: ###-#### Inspection requested via web by Connie Danes
|
FIR20-00236
| INSP-Final Inspection | 4/3/2020 | 4/6/2020 | 4/6/2020 8:21:18 AM | A | FAIL |
|
|
No testing reports and the fire alarm system is not ready for testing.
Please Call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
FIR20-00139
| INSP-Final Inspection | 4/3/2020 | 4/6/2020 | 4/6/2020 8:20:35 AM | A | FAIL |
|
|
No inspection test reports, flow switches and tampers are unhooked and when hooked back up there is a trouble signal also missing a resistor. No testing done. Inspection stopped.
cleared // Buck Phone #: ###-####
|