Inspections for the day of: Tuesday, April 7, 1998.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC98-01084 INSP - Final4/6/19984/7/19984/7/1998 12:00:00 AMAPASS
04/07/98 407 - gas log fire place. ROUGH-IN not a final.
MEC98-01084 INSP - Final4/6/19984/7/19984/7/1998 12:00:00 AMAPASS
04/07/98 407 - gas log fire place. ROUGH-IN not a final.
MEC98-01093 INSP - Final4/6/19984/7/19984/7/1998 12:00:00 AMAFAIL
04/07/98 407 - left a correction at flue pipe.
MEC98-01093 INSP - Final4/6/19984/7/19984/7/1998 12:00:00 AMAFAIL
04/07/98 407 - left a correction at flue pipe.
BLD98-00218 INSP - Framing/Rough-in4/6/19984/7/19984/7/1998 12:00:00 AMAFAIL
04/07/98 407 - left correction.
BLD98-00221 INSP - Framing/Rough-in4/6/19984/7/19984/7/1998 12:00:00 AMAPART
nailing ###-#### ,nailing ok contractor gary on site,2 hold downs at the rear are mis-placed,gary will have the engineer address.
BLD98-00681 INSP - Foundation4/6/19984/7/19984/7/1998 12:00:00 AMAPART
footing was poured before time of inspection,They areas per the plan at the site. But no Boise City approved plans are on site.also the set backs appear ok,They are well aware that the left side will need to be 5 foot minimum when they pour the walls. Walls not form up at this time.
BLD98-00459 INSP - Concrete4/6/19984/7/19984/7/1998 12:00:00 AMPPASS
4/07/98 407 - will pour at 9:00\###-#### jarrette
BLD98-00620 INSP - Foundation4/6/19984/7/19984/7/1998 12:00:00 AMPNR
Not ready at this time.###-#### jerry
MEC98-01104 INSP - Framing/ Rough-in4/7/19984/7/19984/7/1998 12:00:00 AMPCANC
unable to make inspection will try 4/8/97. gas line.###-####