MEC02-02535
| Final | 4/4/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/4/2003 at 8:33:08 AM. Contact: ###-####.
|
MEC02-02526
| Final | 4/4/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | A | PASS |
|
|
PAT KNOCK LOUD AS THESE ARE ELDERY PEOPLE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MEC03-00497
| Final | 4/7/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | A | PASS |
|
|
tml installer on site; Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
MEC03-00015
| Final | 4/7/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | FAIL |
|
|
correction notice at furnace 4/8/2003 12:20:29 AM
|
MEC03-00773
| Rough-in | 4/7/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 9:33:42 AM. Contact: ###-####.
|
MEC03-00419
| Final | 4/7/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 10:08:23 AM. Contact: ###-####.
|
MEC03-00714
| Rough-in | 4/7/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | FAIL |
|
|
finish s.a. duct, foil faced insulation at attic, 2000irc m1601.3.4. #1 4/7/2003 11:35:52 PM
|
MEC03-00714
| Pressure Test | 4/7/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 10:18:39 AM. Contact: ###-####.
|
MEC02-01264
| Final | 4/7/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2003 at 10:33:40 AM. Contact: ###-####.
|
MEC03-00847
| Final | 4/4/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | PASS |
|
|
PLEASE INSPECT GAS LINE TO RANGE AS CLOSE TO 1:00PM AS POSSIBLE.
THANKS
CAROL; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
MEC03-00609
| Rough-in | 4/4/2003 | 4/7/2003 | 4/7/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Lena Sloan
|