MEC04-00347
| Final | 4/5/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | PASS |
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
MEC02-00545
| Rough-in | 4/6/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | PART |
|
|
brad; Phone #: ###-#### general walk through with brad, looked at duct up at this point, ok 4/7/2004 10:50:40 AM
|
MEC04-00877
| Rough-in | 4/6/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | PASS |
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
MEC04-00877
| Pressure Test | 4/6/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | PASS |
|
|
derick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
MEC04-00878
| Rough-in | 4/7/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2004 at 8:12:34 AM. Contact: ###-####.
|
MEC04-00877
| Final | 4/7/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | P | PASS |
|
|
|