BLD03-01884
| BLD-Final | 4/5/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | FAIL |
|
|
bob fink; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need plumbing final. Seal all electrical boxes at exterior walls throughout house. Provide handrail to stairs back of garage. Provide vent well at condensate lines back of house, due to the drains installed below grade.4/7/2004 10:15:56 AM 4/7/2004 10:20:13 AM
|
BLD04-00628
| BLD-Framing/Rough-in | 4/6/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | CANC |
|
|
john tensen; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-02626
| BLD-Framing/Rough-in | 4/6/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | FAIL |
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need trades rough inspection completed. Need seal package completed. Provide r-value for windows, no sticker on windows. 4/7/2004 9:49:05 AM
|
BLD03-02663
| BLD-Final | 4/6/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | CANC |
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Clint not on site to do inspection. 4/7/2004 9:12:51 AM
|
MEC03-03681
| Final | 4/7/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | PASS |
|
|
|
MEC03-03351
| Final | 4/7/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | A | DONE |
|
|
final ok by dave lightfoot.
|
MEC04-00885
| Rough-in | 4/7/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | P | PASS |
|
|
bruce ###-####
|
MEC04-00885
| Pressure Test | 4/7/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | P | PASS |
|
|
bruce ###-####
|
MEC04-00858
| Final | 4/7/2004 | 4/7/2004 | 4/7/2004 12:00:00 AM | P | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|