Inspections for the day of: Friday, April 7, 2006.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-01052 Rough-in4/6/20064/7/20064/10/2006 12:38:01 PMPNR
no address posted, address is suppose to be posted now, recall, thank you
MEC06-01052 Pressure Test4/6/20064/7/20064/10/2006 12:37:26 PMPNR
Jeff -- rough-in and gas test; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-01006 Final4/3/20064/7/20064/7/2006 4:35:59 PMANH
no answer to phone call
MEC06-00980 Final4/4/20064/7/20064/7/2006 2:42:27 PMAPASS
Homeowner will be home in the morning.; Phone #: ###-#### Internet Inspection Request from: Frank Marturello
MEC05-03999 Final4/7/20064/7/20064/7/2006 2:22:21 PMPPASS
Call contractor for access, or use garage code 1094 for left unit, and key on top of refrigerator for right unit.; Phone #: ###-#### Internet Inspection Request from: Frank Marturello
MEC06-01014 Final4/6/20064/7/20064/7/2006 2:12:47 PMAPASS
dave; Phone #: ###-#### Internet Inspection Request from: PATRICK FLEMING
MEC06-01055 Rough-in4/6/20064/7/20064/7/2006 1:13:42 PMAPASS
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
MEC06-01055 Pressure Test4/6/20064/7/20064/7/2006 1:13:26 PMAPASS
Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
MEC06-01069 Rough-in4/7/20064/7/20064/7/2006 12:59:49 PMPPASS
###-####
MEC06-01058 Pressure Test4/6/20064/7/20064/7/2006 11:51:56 AMAFAIL
pressure gauge has dropped, need to soap out piping and recall
MEC06-00339 Conference4/7/20064/7/20064/7/2006 10:57:32 AMAPASS
this building is still in construction stage
MEC06-00317 Conference4/7/20064/7/20064/7/2006 10:57:07 AMAPASS
MEC06-00337 Conference4/7/20064/7/20064/7/2006 10:56:59 AMAPASS
this building is still in construction stage not ready for final
MEC05-03947 Final4/6/20064/7/20064/7/2006 10:32:15 AMAPASS
MEC06-01057 Rough-in4/6/20064/7/20064/7/2006 9:54:50 AMAFAIL
Carl -- rough-in and gas test; Phone #: ###-#### finish exhaust fans in hard ceiling areas and how is make air going to be supplied to bath room and locker room
MEC06-01057 Pressure Test4/6/20064/7/20064/7/2006 9:53:22 AMAPART
Carl -- rough-in and gas test; partial pt test for office and stubbed into warehouse/shop
MEC06-01042 Final4/6/20064/7/20064/7/2006 9:40:14 AMAPASS
MEC06-00085 Final4/7/20064/7/20064/7/2006 9:08:59 AMAPASS
Scheduled by a contractor via Hello! on 4/7/2006 at 7:12:30 AM. Contact: ###-####.
MEC06-01052 Pressure Test4/6/20064/7/20064/6/2006 12:00:00 AMACANC
Jeff; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong /// Cancel per Jeff (Platinum Plumbing) and reschedule for 4-7 PM 4-6-06 eus