BLD05-01409
| BLD-Final | 4/6/2006 | 4/7/2006 | 4/7/2006 4:18:24 PM | P | NR |
|
|
alan brady; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs plumbing final.
|
BLD05-02621
| BLD-Final | 4/6/2006 | 4/7/2006 | 4/7/2006 2:49:04 PM | P | NR |
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs elec and plumbing finals.
|
BLD05-00939
| BLD-Energy code compliance | 4/7/2006 | 4/7/2006 | 4/7/2006 2:12:10 PM | P | PASS |
|
|
Tony -- reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Air seal was completed.
|
BLD06-00674
| BLD-Foundation | 4/7/2006 | 4/7/2006 | 4/7/2006 1:54:31 PM | P | PASS |
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD05-01422
| BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 11:52:04 AM | A | PASS |
|
|
anthony; Phone #: ###-#### Internet Inspection Request from: Letitia Mesawasher boxes were framed with 5/8 type X, 5/8 type X installed behind tubs as approved by G. Slane. All joints were caulked.
|
BLD03-02723
| BLD-Aging Inspection | 4/7/2006 | 4/7/2006 | 4/7/2006 11:11:06 AM | | CANC |
|
|
|
BLD03-02723
| DOC - Permit Expired | 4/7/2006 | 4/7/2006 | 4/7/2006 11:10:56 AM | A | DONE |
|
|
|
BLD03-02716
| BLD-Aging Inspection | 4/7/2006 | 4/7/2006 | 4/7/2006 11:10:30 AM | | CANC |
|
|
|
BLD03-02716
| DOC - Permit Expired | 4/7/2006 | 4/7/2006 | 4/7/2006 11:10:21 AM | A | DONE |
|
|
tenant no longer in space.
|
BLD03-02836
| BLD-Aging Inspection | 4/7/2006 | 4/7/2006 | 4/7/2006 10:59:59 AM | | CANC |
|
|
|
BLD03-02836
| DOC - Permit Expired | 4/7/2006 | 4/7/2006 | 4/7/2006 10:59:47 AM | A | DONE |
|
|
Tenant no longer occupies space.
|
BLD05-01802
| BLD-Final | 4/6/2006 | 4/7/2006 | 4/7/2006 10:42:53 AM | A | FAIL |
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Driveway must be placed prior to final.
|
BLD05-02117
| BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 10:29:49 AM | A | FAIL |
|
|
###-####. Fix 2-ply truss, not per approved fix. Repair holes in 5/8 type X at 1 hr walls.( must connect back to framing member.) noted beam bearing on garage top plate from town house nextdoor. Townhouses must be structurally independent of each other. Provide approved plans and engineering. ok to insul. c/n posted.
|
BLD05-02118
| BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 10:26:17 AM | A | CANC |
|
|
###-####
|
BLD05-02118
| BLD-Framing/Rough-in | 4/6/2006 | 4/7/2006 | 4/7/2006 10:26:04 AM | A | FAIL |
|
|
###-#### - brian. 1.- Provide engineering for repaired open web joists and for floor joist with plumbing penetrations. 2.- Add additional studs under 2 ply AG truss. 3.- Install header over bathroom enterance upstairs. Provide 5/8 type X rock on either side of ML beams as per approved architects letter. 5.- Provide approved insulation betwwen 1 hr. firewalls for required fireblock. 6.- Complete 5/8 type X rock at 1hr wall at rear of house. Provide approved plans and truss engineering. Do not cover.
|
BLD05-02072
| BLD-Energy code compliance | 4/6/2006 | 4/7/2006 | 4/7/2006 9:12:55 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 4/6/2006 at 6:01:03 AM. Contact: ###-####.
|