BLD05-02597
| BLD-Conference | 4/7/2008 | 4/7/2008 | 4/7/2008 5:26:16 PM | P | PART |
|
|
Called and left message with brian blazer to contact me regarding this permit.
|
BLD07-02123
| BLD-Other | 4/7/2008 | 4/7/2008 | 4/7/2008 4:04:24 PM | P | NR |
|
|
ben - prep for slab on grade Phone #: ###-####. wire mesh not yet in place, comnc. will hacve special insp, messh will be verified by special insp.
|
BLD05-03412
| BLD-Conference | 4/7/2008 | 4/7/2008 | 4/7/2008 3:43:01 PM | P | CANC |
|
|
|
BLD05-03412
| DOC - Permit Expired | 4/7/2008 | 4/7/2008 | 4/7/2008 3:42:56 PM | P | PASS |
|
|
work completed, permit has expired.
|
BLD08-00139
| BLD-Footing | 4/7/2008 | 4/7/2008 | 4/7/2008 2:53:33 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2008 at 8:48:37 AM. Contact: ###-####. perimeter footings.
|
BLD08-00140
| BLD-Footing | 4/7/2008 | 4/7/2008 | 4/7/2008 2:53:02 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2008 at 8:50:00 AM. Contact: ###-####. perimeter footings.
|
BLD07-00074
| BLD-Energy code compliance | 4/7/2008 | 4/7/2008 | 4/7/2008 2:14:46 PM | P | PASS |
|
|
Ray; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. All framing issues resolved, received paperwork from floor manufacturer noting that no repair is required to damaged floor joist.
|
BLD08-00016
| BLD-Aging Inspection | 4/7/2008 | 4/7/2008 | 4/7/2008 11:23:33 AM | | DONE |
|
|
|
BLD08-00016
| DOC - Permit Finaled | 4/7/2008 | 4/7/2008 | 4/7/2008 11:23:26 AM | P | PASS |
|
|
Demo completed, TI also completed.
|
BLD07-00077
| BLD-Foundation | 4/4/2008 | 4/7/2008 | 4/7/2008 11:22:57 AM | A | PASS |
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD07-02196
| BLD-Framing/Rough-in | 4/4/2008 | 4/7/2008 | 4/7/2008 10:22:17 AM | A | PASS |
|
|
ron Phone #: ###-####
|
BLD07-02160
| BLD-Framing/Rough-in | 4/4/2008 | 4/7/2008 | 4/7/2008 10:22:05 AM | A | PASS |
|
|
ron Phone #: ###-####
|