ESC08-00233
| Site Preparation | 4/4/2008 | 4/7/2008 | 4/8/2008 11:00:02 AM | P | PASS |
|
|
Perimeter protection installed and Sign posted. CAS #460
|
ESC08-00112
| Tracking Control | 4/7/2008 | 4/7/2008 | 4/7/2008 3:03:29 PM | P | FAIL |
|
|
Tracking out into the street and across sidewalks. No ESC sign post either. Left meesage with RP to contact me. Will re-inspect tomorrow. CAS #460
|
ESC08-00170
| Random Inspection | 4/7/2008 | 4/7/2008 | 4/7/2008 1:35:17 PM | P | PASS |
|
|
All BMP's installed correctly and work has begun. Site looks good. Sign and permit posted at the Wright & Rickenbacker access. CAS #460
|
ESC08-00131
| Site Preparation | 4/7/2008 | 4/7/2008 | 4/7/2008 10:12:13 AM | A | PASS |
|
|
BMP's installedc correctly. Site looks good. Sign postedc at front of project access. No threats seen. Talked with RP over project. CAS #460
|
ESC07-00504
| Random Inspection | 4/7/2008 | 4/7/2008 | 4/7/2008 9:33:42 AM | P | PASS |
|
|
Site looks good. No trash. Very clean project. No threats. CAS #460
|
ESC07-00070
| BMP Violation | 4/7/2008 | 4/7/2008 | 4/7/2008 9:07:40 AM | A | FAIL |
|
|
A good amount of the trash debis have been picked up. But still a substantial amount needs to been picked up and put into the trash bin that is on site. Siltfence has been installed correctly. More BMP's need to be installed on the south end of lot, to protect hillside. Trash debris needs to picked up on the hillsides surrounding lot. Sucko wash need to cleaned up off of hill slope. A STOP WORK ORDER will be d=given tomorrow if issues have not been fully adressed. Will re-inspect tomorrow. CAS #460
|