BLD07-01898
| BLD-Final | 4/6/2009 | 4/7/2009 | 4/8/2009 1:52:51 PM | A | NR |
|
|
Called Jonathan Randall.......Left VM. Told him that he needed to have his subs call in final inspections.........and he needed to get finals on Zoning, ESC and building.
|
ESC08-00945
| Site Preparation | 4/7/2009 | 4/7/2009 | 4/7/2009 4:58:31 PM | P | PASS |
|
|
|
BLD08-02314
| BLD-Footing | 4/7/2009 | 4/7/2009 | 4/7/2009 4:58:16 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2009 at 11:03:53 AM. Contact: ###-####.
|
ESC09-00099
| Site Preparation | 4/7/2009 | 4/7/2009 | 4/7/2009 4:57:56 PM | P | PASS |
|
|
|
BLD09-00279
| BLD-Footing | 4/7/2009 | 4/7/2009 | 4/7/2009 4:28:07 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2009 at 11:01:04 AM. Contact: ###-####.
|
BLD09-00275
| BLD-Footing | 4/7/2009 | 4/7/2009 | 4/7/2009 3:55:08 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/7/2009 at 11:02:34 AM. Contact: ###-####.
|
ESC09-00096
| Site Preparation | 4/7/2009 | 4/7/2009 | 4/7/2009 3:54:49 PM | P | PASS |
|
|
|
BLD07-02085
| BLD-Wall cover | 4/7/2009 | 4/7/2009 | 4/7/2009 3:54:22 PM | P | PART |
|
|
1st floor inspection to insulate Phone #: ###-#### Internet Inspection Request from: Bryan Herb......OK
|
BLD07-02085
| BLD-Energy code compliance | 4/6/2009 | 4/7/2009 | 4/7/2009 3:53:36 PM | P | PART |
|
|
For 3pm if possible. Thanks Phone #: ###-#### Internet Inspection Request from: Bryan Herb 3rd Floor OK
|
BLD09-00199
| BLD-Concrete | 4/2/2009 | 4/7/2009 | 4/7/2009 11:44:19 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD07-02117
| BLD-Final | 4/6/2009 | 4/7/2009 | 4/7/2009 11:40:18 AM | A | NR |
|
|
terry - please call 15 min prior Phone #: ###-#### Need Mech and Electr finals
|