FIR08-00737
| INSP-Sprinkler Rough-in/Hydro | 4/7/2009 | 4/7/2009 | 4/7/2009 5:40:48 PM | P | PART |
|
|
Begin 24 hr. air testing at 11:00 AM @ 40psi.
|
BLD09-00405
| FIRE-Conference | 4/7/2009 | 4/7/2009 | 4/7/2009 5:37:38 PM | P | DONE |
|
|
Discussion regarding correction notice items.
|
FIR08-00825
| FIR-Aging Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 5:36:50 PM | | DONE |
|
|
Pending site inspection request for work completed.
|
FIR08-00366
| INSP-Final Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 5:32:39 PM | P | FAIL |
|
|
SD at the guest elevator lobby 1st and 2nd floors will need to be relocated for compliance with NFPA 72 guidelines.
|
FIR09-00068
| INSP-Final Inspection | 4/3/2009 | 4/7/2009 | 4/7/2009 5:30:41 PM | A | CANC |
|
|
Inspection rescheduled 4/8.
|