Inspections for the day of: Tuesday, April 7, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00058 INSP-Alarm Testing4/6/20094/7/20094/7/2009 5:43:57 PMPCANC
Neither the alarm tech or I could meet at the same time for today. Inspection is rescheduled for tomorrow.
BLD09-00188 FIRE-Final Inspection4/7/20094/7/20094/7/2009 5:37:06 PMPPASS
Life safety passed.
FIR09-00031 INSP-Sprinkler Rough-in/Hydro4/7/20094/7/20094/7/2009 1:28:09 PMPPASS
The above ground hydro test passed. The first test this morning failed but this afternoons test passed.
BLD08-01890 FIRE-Final Inspection4/7/20094/7/20094/7/2009 12:37:57 PMPPASS
life safety passed
FIR08-00636 INSP-Sprinkler Rough-in/Hydro4/7/20094/7/20094/7/2009 12:22:09 PMPCANC
permit finaled
FIR08-00755 INSP-Supply line flush4/7/20094/7/20094/7/2009 11:09:35 AMPPASS
The underground flush passed.
FIR07-00874 INSP-Sprinkler Rough-in4/6/20094/7/20094/7/2009 10:55:52 AMAPASS
See the city approved plans for locations where the sprinkler piping can be covered. It will have todays date.
FIR08-00831 INSP-Sprinkler Rough-in/Hydro4/6/20094/7/20094/7/2009 10:16:32 AMAPASS
The sprinkler piping in the 3rd floor walls of building B is ok to cover. The insulation has been placed between the piping and the exterior wall.
FIR09-00031 INSP-Sprinkler Rough-in/Hydro4/6/20094/7/20094/7/2009 8:49:30 AMAPASS
The 24 hour air test passed.
FIR08-00616 INSP-Final Inspection4/7/20094/7/20094/7/2009 8:03:00 AMPPASS
permit finaled