FIR09-00058
| INSP-Alarm Testing | 4/6/2009 | 4/7/2009 | 4/7/2009 5:43:57 PM | P | CANC |
|
|
Neither the alarm tech or I could meet at the same time for today. Inspection is rescheduled for tomorrow.
|
BLD09-00188
| FIRE-Final Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 5:37:06 PM | P | PASS |
|
|
Life safety passed.
|
FIR09-00031
| INSP-Sprinkler Rough-in/Hydro | 4/7/2009 | 4/7/2009 | 4/7/2009 1:28:09 PM | P | PASS |
|
|
The above ground hydro test passed. The first test this morning failed but this afternoons test passed.
|
BLD08-01890
| FIRE-Final Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 12:37:57 PM | P | PASS |
|
|
life safety passed
|
FIR08-00636
| INSP-Sprinkler Rough-in/Hydro | 4/7/2009 | 4/7/2009 | 4/7/2009 12:22:09 PM | P | CANC |
|
|
permit finaled
|
FIR08-00755
| INSP-Supply line flush | 4/7/2009 | 4/7/2009 | 4/7/2009 11:09:35 AM | P | PASS |
|
|
The underground flush passed.
|
FIR07-00874
| INSP-Sprinkler Rough-in | 4/6/2009 | 4/7/2009 | 4/7/2009 10:55:52 AM | A | PASS |
|
|
See the city approved plans for locations where the sprinkler piping can be covered. It will have todays date.
|
FIR08-00831
| INSP-Sprinkler Rough-in/Hydro | 4/6/2009 | 4/7/2009 | 4/7/2009 10:16:32 AM | A | PASS |
|
|
The sprinkler piping in the 3rd floor walls of building B is ok to cover. The insulation has been placed between the piping and the exterior wall.
|
FIR09-00031
| INSP-Sprinkler Rough-in/Hydro | 4/6/2009 | 4/7/2009 | 4/7/2009 8:49:30 AM | A | PASS |
|
|
The 24 hour air test passed.
|
FIR08-00616
| INSP-Final Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 8:03:00 AM | P | PASS |
|
|
permit finaled
|